1.1. The Subject Of The Order Is The Performance Of Staged Demolition And Security Works In The Existing A-2 Building Of The Poznań University Of Technology, On The Warta Campus At Ul. Piotrowo 5 In Poznań. The Works Constitute Preparation Of The Facility For Reconstruction And Expansion, Including The Designed Atrium, Main Hall And Hidden Places Of Category U1. The Order Includes The Demolition Of The Existing Connector, Part Of The Lecture Hall Pavilion And Elements Colliding With The Planned Investment, Installation Dismantling, Construction Of Structural Protection And Partitions Separating The Work Zone, Management Of Materials And Waste, And Documentation Of The Works Performed. Construction Of The Target Atrium, Lobby And U1 Structure Is Outside The Scope Of This Opz, Other Than The Safeguards Expressly Described Below. The Execution Connection With These Works Is Specified In Point 4. Main Cpv Code: 45111100-9 - Demolition Works. Supplementary Code: 45111220-6 - Debris Removal Works1. 2. The Spatial Scope, Geometry, Dimensions, Demolition Limits, Levels Of Remaining Structures And Security Details Result From The Design Documentation Constituting Annexes To Swz Ii - Description Of The Subject Of The Order. The Basis For The Description Is The Demolition Detailed Design For The Reconstruction And Expansion Of Building A-2, Construction Industry, Prepared By M.Sc. Eng. Katarzyna Starzecka, Checked By M.Eng. Piotr Starzecki, Poznań, September 20261. 3. Material Scope Of Works1.3.1. Preparation And Organization Of Works• Taking Over And Securing The Work Area, Constructing Fences, Markings, Separating Dangerous Zones, Transport Routes And Places For Collecting Materials And Waste.• Developing A Bioz Plan To The Extent Required By Law.• Documenting The Condition Of The Existing Structures And Installations In The Area Affected By The Works, Including Photographic Documentation Before The Commencement Of Works.• Protecting The Retained Elements Against Damage, Dust, Precipitation And Access By Unauthorized Persons; Protection Of Edges, Openings And Level Differences.1.3.2 Installations And Equipment• Inventory Of Devices, Cables, Ducts And Connections In The Demolition Zone And Identification Of Installations Serving The Remaining Part Of The Building.• Execution Of Switches, Disconnections, Disconnections, Plugs And Protections Indicated In The Industry Documentation. Before Demolition Of The Structure, It Is Necessary To Confirm The Effective Disconnection Or Protection Of All Installations In The Work Zone. • Stage I: Disconnection And Protection Of Installations In The Demolition Area, While Maintaining The Functioning Of The Installations Intended For Further Use. Stage Ii: Dismantling Of Devices In The Underground Part After Disconnecting Them And After Performing The Required Switching.• Dismantling Of The Main Electrical Switchboard With Equipment And Cabling, Heating Nodes, Ventilation And Air-Conditioning Units, Ducts, Pipelines, Supp
|