|
Siteworks – Construction Logistics - Construction Site Equipment For The Renovation And Expansion Of The Oggs Overath. 1.1 Advance Notice On The Construction Site 2.1 Erect And Dismantle The Metal Mesh Fence 2.2 Relocate The Metal Mesh Fence 2.3 Maintain The Metal Mesh Fence 2.4 Erect And Dismantle The Gate System With Two Leaves, 4.0 M 2.5 Provide The Gate System With Two Leaves, 4.0 M 2.6 Erect And Dismantle The Wooden Construction Fence 2.7 Provide And Maintain The Wooden Construction Fence 2.8 Set Up And Dismantle Gate System, 2-Leaf, 5.0 M 2.9 Gate System, 2-Leaf Wooden Construction Fence, 5.0 M, Provision Of Construction Site Power Supplies 3.1 Construction Site Power Supply 3.2 Construction Site Power Connection, Provision + Operation 4.1 Construction Water Connection 4.2 Construction Water Connection, Provision And Operation 5.1 Produce, Maintain/Operate And Dismantle Safety Lighting 5.2 Safety Lighting, Provision And Operate 6.1 Wastewater Connection, Dn 150 6.2 Sewage Pipe, Maintain 7.1 Manufacture And Dismantle Container System With Basic Reserve Time 7.2 Maintain And Operate Container System, Entire Construction Period 7.3 Manufacture And Dismantle Sanitary Container System For Washing Toilet 7.4 Maintain And Operate Sanitary Container System For Washing Toilet For Entire Construction Period 7.5 Manufacture And Dismantle Black And White Sanitary Container System 7.6 Maintain Black And White Sanitary Container System For Pollutant Remediation, Operate 8.1 Deliver, Set Up And Clear Mobile Toilet Cubicle 8.2 Maintain And Maintain Mobile Toilet Cubicle 9.1 Tower Crane, H>46.0M, L>55.00M, 1.8T 9.2 Reserve Tower Crane, H>46.0M, L>62.5M, 1.8T 10.1 Cover Floor Covering, Coated Cardboard 10.2 Floor Cover, Hardboard 10.3 Floor Covering, Mats, Osb Panels 10.4 Cover The Staircase, Wood-Based Panels 10.5 Temporarily Close The Window Opening, Wooden Substructure With Foil 10.6 Close The Window Opening; Fabric Foil 10.7 Metal Construction Door, 1-Leaf, Lockable 10.8 Slatted Frame With Wood Fiber Board, Up To 2.5 M2 10.9 Slatted Frame Covered With Foil, Up To 2.0 M2 10.10 Temporarily Close The Opening, Osb Board, Construction Door, 10.11 Staircase Railing, Temporary 10.12 Protective Cover For Floor Surfaces Cover Fleece 10.13 Building Protection Wall, Wood-Based Panels 10.14 Building Protection Wall, Door Training 11.1 Winter Service, Construction Road / Storage Areas 11.2 Winter Construction Heating System, Oil, Provision And Commissioning 11.3 Winter Construction Heating System, Operation, Rent, Oil 12.1 Skilled Worker Hours For Unforeseen Work 12.2 Helper Hours
|