3.1.Material Scope Of The Subject Of The Order - Extension Of The Cultural Center In Powidz In The Design And Build Formula.3.2. The Investment Will Be Carried Out In Powidz: At Ul. Park Powstańców Wielkopolskich 25 On Plots 1018/2 And 435. The Main Components Of The Dk Will Be An Auditorium For Approximately 200 People With Cloakroom And Sanitary Facilities, A Music Room, Classrooms, A Meeting Room With Kitchen Facilities And A Gallery Intended For Permanent And Temporary Exhibitions. The Facility Will Be Adapted To The Needs Of Disabled People In Terms Of Accessibility. To Service The Building On The Plot In Question, Sidewalks, Driveways, Parking Spaces And Basic Development Elements Such As Benches, Lighting, And A Built-In Garbage Bin Are Planned.3.3.The Ordering Party Has The Right To Use The Property For Construction Purposes In The Scope Of Part Of The Area Where The Investment Will Be Implemented And Any Shortcomings In This Respect Will Not Be Borne By The Contractor.3.4.The Detailed Scope Of The Subject Matter Of The Order Is Described In The Functional And Utility Program Constituting An Annex To This Specification And Includes, Among Others: 3.4.1.Carrying Out Preparatory Work Consisting In Preparing A Map For Design Purposes, Inventory Of Greenery, Applying To Network Operators For Technical Conditions For Connecting Utilities.3.4.2.Preparation Of A Technical Assessment Of The Existing Building Of The Cultural Center (Hereinafter Referred To As Dk), Preparation Of A Demolition Project Of Part Of The Existing Building Of Cultural Center And Part Of The Garages, Along With Obtaining A Final Decision On The Permit For Partial Demolition Of The Facility. 3.4.3. Preparation Of Architectural And Construction Documentation On The Basis Of The Pfu, Along With All Necessary Arrangements (Zud, Signatures Of Appraisers, Conservator, Agreement On Designs With Network Operators, Agreement On A Road Design With Temporary Traffic Organization, Permit For Cutting Down Trees) And Obtaining A Final Construction Permit Decision On Behalf Of The Investor.3.4.4.Preparation Of Technical Designs In All Industries And Other Documentation Necessary For The Implementation Of Construction Works Together With Stwior. The Designs Must Present The Detailed Location Of All Devices, Installations And Building Elements (The Design Must Also Include The Equipment And Furniture Of The Facility In Accordance With The Employers Guidelines).3.4.5.Execution Of Construction Works And Land Development: - Demolition Of Part Of The Existing Dk Building And Part Of The Garages; - Expansion Of The Dk Building In Accordance With Technical Designs; - Construction Of Technical Infrastructure For Power Supply To The Buildings; - Development Of The Plot Area Along With Small Architecture.3.4.6.Preparation Of Technical Documentation, Geodetic Inventory And Other Documents Necessary To Obtain The Final Decision On Approval Of The Facility For Use.3.4.7.As Part Of The Subject Of The O
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119332745
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.