1. The Subject Of The Order Is The Execution Of Construction Works Together With Supplies, Constituting The First Stage Of The Investment Called Construction Of A Storage Shed At A Selective Municipal Waste Collection Point With Land Development, Based On The Design Documentation Provided By The Ordering Party2.Place Of Order Fulfillment: Voivodeship: Masovian Voivodeship; District: Ostrołęka; Commune: Czarnia; Town: Czarnia, Plot No. 2182/2, Precinct 0005 Czarnia, Registration Unit 141502_2 Czarnia - Area Of The Existing Selective Municipal Waste Collection Point (Pszok).3.The Location Of The Facilities And The Scope Of Land Development Are Determined By The Land Development Plan (Drawing A-Pzt-01), Which Is Part Of The Design Documentation Constituting Annex No. 8 To Swz.4.The Ordering Party Has The Right To Use The Property For Construction Purposes (Pzt, Point 1.6). There Is A Pszok On The Investment Site (Social Container, Shelter For Sorted Waste, Containers And Containers, Existing Tight Septic Tanks), Which Remains Open During The Execution Of The Order.5.The Investment Referred To In Section 1, Will Be Implemented In Stages, Based On One Building Permit Decision And Design Documentation Covering The Entire Construction Project. This Order Covers Only The First Stage Of The Investment, Which, In Accordance With The Design Documentation And Stwiorb, Includes: 1) Construction Of A Warehouse Shelter - Measurement Works, Topsoil Removal, Earthworks, Foundation Footings And Foundations With Insulation, Floor With A Chemically Resistant Epoxy Coating, Building Envelope, Steel Structure, Wall Cladding And Roof Covering With Lighting Strips, Sheet Metal Work, Roof Drainage, Ventilation, External Joinery, Blacksmith And Locksmith Elements, Equipment With Fire Extinguishers And Safety Signs - In Accordance With The Architectural And Construction Design, Technical Design Of The Architectural And Construction Industry And Stwiorb;2) Electrical Installations Of The Shelter: Cable Line Supplying The Shelter From The Switchboard Of The Existing Social Container, Fire Protection Switchgear (Rwp), Shelter Switchboard (Rw), Installation Of Plug Sockets In The Shelter, Shelter Lighting, Ring Earthing And Connections Compensation - In Accordance With The Technical Design Of The Electrical Industry;3) Truck Scale - Earthworks And Subsoil, Foundation And Delivery, Assembly, Commissioning And Verification Of The Scale Set - In Accordance With The Architectural And Construction Design, Technical Design Of The Architectural And Construction Industry And Stwiorb;4) Power Supply Of The Scale Devices From The Existing Circuit Of The Social Container Switchgear And Teletransmission Cabling In The Casing Pipe Between The Scale And The Social Container - In Accordance With The Technical Design Of The Electrical Industry;5) Stormwater Drainage In The Scope Of Draining Rainwater And Meltwater From The Scale To Existing Tight Septic Tanks, Together With A Separator Of P
|