Tenders Are Invited For Reconstruction Of The Roof Of The Folk House Building As Part Of The Task Entitled: ... in Poland
Tender Notice
TenderID
119332672
Tender Brief
Tenders Are Invited For Reconstruction Of The Roof Of The Folk House Building As Part Of The Task Entitled: Modernization Of The Building Of The Folk House In Żywocino
1. The Subject Of The Order Is The Extension Of The Roof Of The Folk House Building As Part Of The Task Entitled: Modernization Of The Folk House Building In Żywocino.2.The Roof Extension Will Consist In Demolishing The Existing Roof On Various Levels And Constructing A New One On One Level According To: Attached Design Documentation. 3. The Ordering Party Informs That It Has And Will Make Available To The Contractor The Following Construction Materials For The Purpose Of Executing The Order: 1) Flat Sheet Metal 0.50X1250x2000 Topmat – 80M², 2) Proaqua Graphite Gutter 125/4000Mm – 22 Pcs., 3) Proaqua Graphite Gutter Connector 125 – 18 Pcs., 4) Bottom Left Gutters Proaqua Graphite 125 – 1 Pc.,5) Right Gutter Bottom Proaqua Graphite 125 – 1Pc.,6) External Corner. Proaqua Graphite 125/90 – 3 Pcs.,7) External Corner. Adjustable Graphite 120-145 Degrees - 2 Pcs, 8) Proaqua Graphite Gutter Hook 125 - 190 Pcs, 9) Proaqua Graphite Drain Funnel 125/90 - 7 Pcs, 10) Proaqua Graphite Double-Socket Elbow 90 - 14 Pcs, 11) Single-Socket Elbow Proaqua Graphite 90 – 7 Pcs., 12) Proaqua Graphite Downpipe 90/4000Mm – 10 Pcs., 13) Proaqua Graphite 90 Pipe Clamp – 21 Pcs., 14) Screw For The Clamp With A Dowel L=240Mm – 21 Pcs., 15) Fiord Topmat Metal Roofing Tile – 610 Pcs., 16) Conical Carpentry Screw 5X70 200 Pcs. – 5 Packs, 17) Conical Carpentry Screw 5.0X90 200 Pcs. – 5Op.4.The Contractor Is Obliged To Take Into Account The Fact Of Transferring The Above-Mentioned Materials By The Ordering Party And Do Not Include The Cost Of Their Purchase In The Offer Price.5.The Cost Of Transporting Materials From The Place Of Storage To The Construction Site, Unloading, Securing And Installing Them Is Entirely The Responsibility Of The Contractor. The Contractor Must Include These Costs In The Bid Price.6.The Contractor Is Obliged To Accept The Materials Quantitatively And Qualitatively When They Are Handed Over By The Ordering Party. From The Moment Of Signing The Material Acceptance Protocol, The Contractor Is Fully Responsible For Their Loss, Damage Or Destruction.7.The Minimum Required Warranty Period Is 24 Months.8.The Detailed Scope Of Works Is Specified In The Annexes To This Swz (Design Documentation - Annex No. 8 To The Swz, Draft Contract - Annex No. 6 To The Swz)
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119332672
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.