Construction Of A Re-Anchored Bored Pile Wall Over A Length Of Around 50 M Construction Of A Re-Anchored Bored Pile Wall With Plug-In Girder Shoring Over A Length Of Around 165 M Immediately Adjacent To The Embankment Of The U3bahn. Creation Of An Hdi Underpinning For An Immediately Adjacent Existing Building Over A Length Of Around 20 M Construction And Dismantling Of A Anchored Support Pile Wall Over A Length Of Around 10 M Construction And Dismantling Of A Free-Standing Support Pile Wall Over A Length Of Around 122 M Immediately Adjacent To The Tracks At The Depot Construction Of A Sloped Construction Pit Over A Length Of Around 60 M Dismantling Of The Filled Basement Over An Area Of Around 4,380 M² And With An Excavation Volume Of Around 10,000 M³ Excavation Of The Construction Pit To The Final Depth Over An Area Of 6,630 M² And An Excavation Volume Of Around 24,000 M² M³ Open Dewatering Incl. Preparation For Discharge Into The Barmbeker Branch Canal.
Contact Information
Address
Steinstraße 20, 20095, Hamburg
Email
einkauf108@hochbahn.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119322927
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.