|
Bids Are invited for Custom Bid For Services - Arc For Cable Laying Including Trench Cutting And Jointing At Kiom - Laying Of Ht Power Cable Of 11 Kv Grade 3 Core X 120 Sqmm To 185 Sqmm With Provision Of Sand For Cushioning And Bricks Protection (Os Of Brick /Metre) For Cable & Refilling Of Trench.(Sand And Bricks Have To Supplied By The Contractor. , Trench Cutting In All Kinds Of Soil With Trench Size 500 Mm X 400 Mm & Laying Of 3C/4C, 90 Sqmm To 120 Sqmm, Lt/Ht Cables (To Be Supplied By Kiom Free Of Cost) With Provision Of Bricks Protection (Minimum 7 Nos. Of Bricks Per Meter) And Sand For Cushioning Of Cables & Refilling Of Trench With Soil. , Trench Cutting In All Kinds Of Soil With Trench Size 500 Mm X 400 Mm & Laying Of Telephone Cables Of Size 100 To 200 Pairs ( To Be Supplied By Kiom Free Of Cost) With Provision Of Bricks Protection (Minimum 7 Nos. Of Bricks Per Meter) And Sand For Cushioning Of Cables & Refilling Of Trench With Soil. , Supply Of Outdoor Type Heat Shrinkable End Termination Cable Joint For 11Kv, 3C X 120 Sqmm To 3C X 185 Sqmm. Cables. , Making Of Outdoor Type Heat Shrinkable End Termination Cable Joint For 11Kv, 3C X 120 Sqmm To 3C X 185 Sqmm. Cables. , Supply Of Indoor Type Heat Shrinkable End Termination Cable Joint For 11Kv, 3C X 120 Sqmm To 3C X 185 Sqmm. Cables. , Making Of Indoor Type Heat Shrinkable End Termination Cable Joint For 11Kv, 3C X 120 Sqmm To 3C X 185 Sqmm. Cables. , Supply Of Heat Shrinkable Straight Through Joint For 11Kv, 3C X 120 Sqmm & 3C X 185 Sqmm. Cables. , Making Of Heat Shrinkable Straight Through Joint For 11Kv, 3C X 120 Sqmm & 3C X 185 Sqmm. Cables. , Supply Of Outdoor Type Heat Shrinkable End Termination Cable Joint For 3.3 Kv, 3Cx70 Sqmm To 3Cx185 Sqmm Cables. , Making Of Outdoor Type Heat Shrinkable End Termination Cable Joint For 3.3 Kv, 3Cx70 Sqmm To 3Cx185 Sqmm Cables. , Supply Of Indoor Type Heat Shrinkable End Termination Cable Joint For 3.3 Kv, 3Cx70 Sqmm To 3Cx185 Sqmm Cables. , Making Of Indoor Type Heat Shrinkable End Termination Cable Joint For 3.3 Kv, 3Cx70 Sqmm To 3Cx185 Sqmm Cables. , Supply Of Straight Through Heat Shrinkable End Termination Cable Joint For 3.3 Kv, 3Cx70 Sqmm To 3Cx185 Sqmm Cables. , Making Of Straight Through Heat Shrinkable End Termination Cable Joint For 3.3 Kv, 3Cx70 Sqmm To 3Cx185 Sqmm Cables. , Excavation For Cable Trenches Of Depth Upto 1.2 Meter In Soft Soil Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil For Removing / Taking Out The Power Cables As Mentioned In Job 16. , Erection Of Structural Steel (Cable Tray And Cable Support). , Trench Cutting In All Kind Of Soil With Size 750Mm X 500Mm And Laying Of 20/50 Pair Telephone Cable With Provision Of Sand For Cushioning For Cable & Refilling Of Trench. , Laying Of Cable 3 X 1/2 Core, 50 Sqmm Including Trench In All Kind Of Soil Of Size 500Mm X 400Mm Including Laying Of Cable And Trench Cutting. , Laying Of Additional Ht/Lt Telephone Cable In Existing Cable Trench With Provision Of Sand For Cushioning For Cable & Refilling Of Trench. , End Termination Of 3 & Half Core Cable Upto 95Sqmm Cable With Required Size Gland & Aluminium Lugs Etc Complete. , End Termination Of 3 & Half Core Cable From 120Sqmm To 300Sqmm Cables With Required Gland & Aluminium Lugs Etc Complete. , Laying Of Ht Power Cable (3.3Kv/11Kv), 3 / 3.5 / 4 Core, 95 Sq. Mm To 185 Sq. Mm Partly On Existing Cable Trays Or Partly In Trench Including Cutting Of Cable Trench Of Size 500Mm X 500Mm With Provision Of Sand For Cushioning For Cable & Refilling Of Trench. , Laying Of Lt Power Cable (1.1Kv), 3 / 3.5 / 4 Core, 95 Sq. Mm To 185 Sq. Mm Partly On Existing Cable Trays Including Proper Cl Ing With Heavy Duty Plastic Tie / Gi Wire. , Laying Of Lt Control Cable (1.1Kv), 7 Core/ 10Core/ 19 Core, 24 Core, 2.5 Sq. Mm In The Existing Cable Tray Including Proper Cl Ing With Heavy Duty Plastic Tie. , Laying Of Ht / Lt Power Cable(1.1Kv/3.3Kv/11Kv), 3 Core/ 3.5 Core/ 4 Core, 240 Sq. Mm To 300 Sq. Mm In The Existing Cable Tray Including Proper Cl Ing With Heavy Duty Plastic Tie , Laying, Dressing, Cl Ing, Securing And Routing Of 6/12 Core Single/Multi Mode Optical Fiber Cable (Ofc) Through Existing Cable Trenches, Cable Racks, Electrical Poles, Trees And Other Available Structures At Various Locations As Directed By The Engineer-In-Charge. , Laying, Dressing, Cl Ing, Securing And Routing Of 24/48 Core Single/Multi Mode Optical Fiber Cable (Ofc) Through Existing Cable Trenches, Cable Racks, Electrical Poles, Trees And Other Available Structures At Various Locations As Directed By The Engineer-In-Charge.
|