Bus Station Construction Work – Neubau Bushof Ettiswil Lu. General Description The Ettiswil Bus Station Is An Important Regional Transport Hub For Public Transport. It Functions As A Transfer Point And Links The Bus Routes From Lucerne, Sursee, Willisau And Dagmersellen. The Bus Station Is Characterized By Its Location In The Village Center, The Direct Connection To The Cantonal Road Network From Four Directions, The Limited Space And A Medium-Frequency Bus Service (½ Hourly) Tailored To The Various Routes. In Order To Meet The Future Requirements Of The Regional Transport Hub, A New Bus Station Is Planned. The Central Location In The Village Center Will Be Upgraded In Terms Of Urban Development And The Legal Requirements Of The Equal Opportunities For Persons With Disabilities Act Will Be Implemented. The Bus Station Project Is Essentially Characterized By The Following Components: * Five Holding Edges A To E For Articulated Buses And Three Platforms. * Central Space On Platform 2 With Bicycle Parking, Toilet Facilities, Passenger Information, Ticket Machine And Seating. * Covering Platforms 1 And 2 (Platform 3 Is Not Covered). * Three Short-Term Parking Spaces (Kiss & Ride) With Access From Willisauerstrasse K 18. One Of These Parking Spaces Is Wheelchair Accessible. * Covered Bicycle Parking Area Next To The Miv Parking Spaces. * Alley Of Trees Along Grosswangerstrasse And Willisauerstrasse. * Adaptation Of The “Am Bächli” Junction With New, Rear Pedestrian Routes. * Widening Of Grosswangerstrasse And New Construction Of Mittelinsel. * Redesign Of The “Alte Schmitte” Area With Demolition Of The Outbuildings That Are Not Worth Preserving And A New Arrangement Of The Two Outbuildings. * Construction Work In Civil Engineering And Building Construction For The Construction Of The New Bus Station In Ettiswil Civil Engineering The Construction Work Essentially Consists Of The Following Elements: * Building Dismantling (Post Office Building, Schmitte Extension, Specific Equipment) * Dismantling Of Plants, Fences, Walls, Coverings, Closures, Shafts, Pipes, Etc. * Plant Line Construction (Electricity, Lighting, Communication) * Drainage Systems: Pipes For Wastewater And Rainwater, Shafts, Sludge Collectors, Drains, Gutters, Retention System 30 M3 * Tree Pits * Foundations * Road Superstructure (Cases, Ends, Coverings, Pedestrian Island Glued) * Asphalt Coverings (2 And 3 Layers), Concrete Composite Blocks, Pavements, Concrete Roadways (2 Layers) * Special Curbs For Bus Stops With Various Custom-Made Products (Special Natural Stones) Building Construction The Building Construction Work Consists Of The Following Main Elements: * Large Platform Roof With 6 Clamped Supports And Bucket Foundations * Elongated Platform Roof With 3 Clamped Supports And Bucket Foundations * Bicycle Shelter With 1 Clamped Support And Bucket Foundations, 1 Concrete Wall Panel * Base Plate With Frost Bars And Small Parapets For Toilet Buildings Under The Large Platform Roof * Floor Plate With Frost Bars And Small Parapets For Double Garage * Floor Slab With Frost Bars And Small Parapets
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119281816
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.