|
Construction Work For Buildings Relating To Health - Design And Execution Of Construction Works As Part Of The Investment Called Construction Of A Comprehensive Care Center For Children With Rheumatic Diseases At The Dr. Jadwiga Titz-Kosko Pomeranian Rheumatology Center In Sopot Sp. Z O.O. Together With The Demolition Of The Existing Facility And Obtaining An Occupancy Permit Located In Sopot At Ul. 23 March 93. 5. The Scope Of Work Includes: A. Demolition Of The Existing Rheumatology And Rehabilitation Building For Children At The Geriatric Care Center Of The Pomeranian Rheumatology Center In Sopot, Together With The Demolition Of Development Elements And The Development Of A Multi-Discipline Technical And Executive Design, Workshop Designs, Other Required Designs And Analyzes And Execution Of Construction Works (Including Technical And Executive Designs Of The Following Installations: Water And Sewage, Central Heating, Electrical Installations In Terms Of Switchboards, Emergency And Evacuation Lighting, And Ssp For The Target Arrangement Of The Second (2Nd) Floor), As Well As Obtaining A Valid Permit To Use The Building Of The Center For Comprehensive Care For Children With Rheumatic Diseases At The Pomeranian Rheumatology Center. Dr. Jadwiga Titz-Kosko In Sopot Sp. Z O. O. Along With Technical Infrastructure – Stage I; B. Development Of A Construction Design, Multi-Discipline Technical Design, Detailed Design, Workshop Designs, Other Required Designs And Analyses, Obtaining A Building Permit And All Other Necessary Permits, Decisions And Arrangements, And Execution Of Construction Works, As Well As Obtaining A Valid Permit To Use An Above-Ground Parking Lot For 30 Parking Spaces With A Parking System And Technical Infrastructure, An Underground Retention Tank For Rainwater, A Station With An Oxygen Tank And A Shelter With Oxygen Expansion Plant – Stage Ii; C. Development Of The Area And Greenery, Construction Of Exits, External Installations And Connections Necessary For The Proper Functioning Of The Investment And Obtaining A Decision On The Occupancy Permit For Stages I And Ii, Along With Obtaining The Necessary Permits, Decisions, Arrangements, Technical Conditions, Acceptance And Other Formal Documents Required For The Implementation Of Construction Works Covered By Stages I And Ii; D. Construction Of A Drilling Platform For Drilling A Chalk Well - Implementation Within Stages I And Ii; E. Development Of A Construction Design, Multi-Discipline Technical Design, Detailed Design, Workshop Designs, Other Required Designs And Analyses, Obtaining A Building Permit And All Necessary Arrangements, Decisions, Permits, Etc., Execution Of Construction Works And Obtaining An Occupancy Permit As Part Of The Arrangement Of The Second (2Nd) Floor Of The Building Of The Center For Comprehensive Care For Children With Rheumatic Diseases - Stage Iii; Scope Covered By The Option Law Referred To In Point 29. F. Provision Of Service, Inspection And Maintenance Services Of All Systems, Installations And Devices, Including Equipment, The Servicing, Inspection And Maintenance Of Which Are Required By Regulations And Manufacturers Recommendations In Order To Maintain Continuous Efficiency And Compliance With Warranty Conditions, As Well As Greenery Care Services - During The First Three (3) Years Of The Warranty, As Part Of The Investment Called Construction Of A Comprehensive Care Center For Children With Rheumatic Diseases At The Dr. Jadwiga Titz-Kosko Pomeranian Rheumatology Center In Sopot Sp. Z O.O. 6. Subject Of
|