Construction Project Management Services – Rs-713.A: Project Management. The Schweinfurt District Needs Project Management For The Construction Project Described Below: New Construction Of The Secondary School In Schonungen The District Of Schweinfurt Is Planning To Build The New Secondary School In Schonungen On A Formerly Agricultural Area (Area No.: 1392/7, 1267, 1268, 1269) Above The Existing Municipal Outdoor Sports Area. The Property Has A Large Height Development, From The Low Point (Access) To The High Point The Difference In Height Is Approx. 22 M (See Site Plan). The Future School Site Will Be Redeveloped; For This Purpose, The Existing Access Road To The Naturfreundehaus Will Be Extended And Redesigned. The Public Development With Expansion Of The Access Road, Sewer, Water, Electricity And Fiber Optic Supply Will Be Rebuilt As Part Of The Measure. Optionally, Local Heating Is Available From The Existing Combined Heat And Power Plant In The Municipality Of Schonungen. The Structure Should Be Constructed Using Wooden Elements From The Top Edge Of The Ground Or Floor Slab. The Required Parking Spaces Must Be Built On The Property In The Open Space Or In The Basement Of The School Building (Ug). When Planning, Attention Must Be Paid To The Acoustic And Fire Protection Requirements Of The Wooden Structure. It Is Planned To Implement The Bim Method In The Sense Of Integral Planning. In Order To Integrate It Into The Landscape, The Building Should Be Planned In A Staggered Manner And Have A Maximum Of Three Floors. In Addition, With Regard To Integration Into The Landscape, The Relevant Specifications Such As Edge Greening, Color Design And Facade Greening Of The Development Plan Must Be Observed. When Planning The Facade, Attention Should Be Paid, Among Other Things, To Bird-Friendly Glazing With An Anti-Reflective Coating And To Provide For Facade Greening. The Plans Must Be Coordinated With The Responsible Department Of The District Office. In Order To Promote Soil And Water Protection, Rainwater Should Be Retained On The Property And, If Possible, Reused As Gray Water. On The Other Hand, Protection Against Heavy Rain Events Should Be Built, For Example By Means Of Ditches, Dams Or Protective Walls. Rainwater Management With An Irrigation Concept Must Be Planned. As Part Of The Energy Concept, A Photovoltaic System To Generate Electricity Is To Be Built On The Green Roof. The Energy Concept Must Be Developed Based On The Clients Specifications. The Spatial Program Of The New Secondary School Building Is Currently Designed For 21 Classes Based On The Teacher Room Principle With A Focus On Music And Mint. The Hnf Is 4,446 M² According To The Governments Spatial Program. Lower Franconia From November 26Th, 2020. The Functional Connections As Well As The Barrier-Free Access To The Property And The School Building And The Other Building Requirements Must Be Taken Into Account. It Is Planned To Take Advantage Of Funding In Accordance With Bavaria Fag Art 10 And 12.A As Well As Possible Funding For Energy Measures Or Other Sustainability Measures.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119276762
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.