|
Construction Work – B/20/2026 Reconstruction Of The Building Of The Main Library And The Institute Of History Of The University Of Opole.. The Subject Of The Order Is: Reconstruction Of The Building Of The Main Library And The Institute Of History Of The University Of Opole. The Description Of The Subject Of The Order Is Attached As Annex No. 1.A To The Swz - File Folder. 1. Requirements Regarding The Subject Of The Order 1.1. The Offer Must Be Unambiguous And Comprehensive, I.E. Cover The Entire Subject Of The Order, Including: - Development Of Test And Measurement Protocols Required In Accordance With Technical Conditions, Polish Standards And Construction Practices, Protocols From Start-Up And 24-Hour Continuous Operation Of All Systems And Devices, As Well As From Functional Tests Of Systems, User Manuals (In Polish), Service Access Codes To Control And Management Systems. - Training Of Uo Employees In The Operation Of Installed Devices And Installations, - Inspection And Service Plan, - Obtaining The Necessary Technical Approvals (In Polish), - Obtaining Quality Approvals And Certificates (In Polish), - Obtaining A Declaration Of Compliance With Pn (In Polish), - Developing Measurement Protocols For Lan Structured Cabling And Other Installed Installations, - Obtaining A System Warranty For The Lan Structured Cabling (Copper Connections), - Removing Any Damage Resulting From The Work Carried Out, - Preparation Of As-Built Documentation (Three Copies In Paper Version And One In Electronic Version On A Medium (Pen Drive), - Obtaining An Occupancy Permit Or Notification Of Completion Of Construction - Securing The Construction Site And The Construction Site And Its Proper Marking, In Accordance With Applicable Regulations. - Inspections, Services And Repairs During The Warranty Period, Replacement Of Consumable Parts, Filters, Etc. - Delivery And Installation, Connection, Commissioning, Carrying Out The Required Tests, Brand New Equipment (Especially Unrepaired, Not Remanufactured, Not Exhibited, Not Previously Used) From Current Production And A Legal Distribution Channel, Efficient, Complete (In Particular With All Components, Parts, Materials, In Accordance With Annex 1A To This Swz) Meeting The Relevant Standards And Having The Required Marketing Authorizations And Certificates (Including Compliance With Ce Standards In Terms Of Safety 1.2 Is To Take Into Account All Circumstances Arising From The Order Documentation. 1.4. The Subject Of The Order Will Be Performed For The Benefit Of The Contractor And Within The Remuneration (Specified In The Offer) Due To The Contractor. 2. Deadline For Completion Of The Subject Of The Contract: From The Date Of Conclusion Of The Contract, No Later Than December 17, 2027. 3. All Required Consents And Decisions Must Be Obtained Before The Commencement Of Use Constituting The Subject Of The Order. 4.2 The Warranty Period Indicated In Point 4.1 Is Approx
|