Part I Of The Order - Paving Works 4.4.1 The Scope Of Work Includes, In Particular: 1). Task 1 - Pedestrian Road -H (Pages 81, 82 Of The Bill Of Quantities) The Task Should Include The Construction Of, In Particular: - A Pedestrian Road With A Surface Of Granite-Like Concrete Slabs, 3.00 M Wide, Framed With 8X30 Cm Graphite Concrete Edges Placed On A Concrete Footing With Resistance, - Terrain Stairs Made Of Concrete Stair Blocks On A Concrete Footing C20/25 With Stainless Steel Balustrades, - Slope Reinforced With Openwork Concrete Slabs, Dimensions. 40X60x10cm - Color Graphite, The Above Task Should Be Performed In Accordance With The Nepryszki River Valley Development Project - Pedestrian Road. - Along The Edge From The Reservoir Side, The Paving Contractor Will Leave A 3 Cm Space For Installing Aluminum Profiles For Led Strips2). Task 2 - Sidewalk At Ul. Źródlana (P. 103, Item 1, P. 104, Item 9, Bill Of Quantities) The Task Should Include, In Particular: - Demolition Works (Fence, Edges And Pavers), - Reinforcement Of The Ground, Min. 6 Cm And Its Profiling, And Securing All Slopes With A Galvanized Steel Mesh - Beavers Burrows, (The Mesh Should Be Dug In Such A Way That It Is Below The Plant Base, Spot Clearing Of Bushes), - Relocation Of The Pedestrian Road Surface With A Surface Made Of Concrete Cubes With A Frame Of 8X30cm Edges (On Both Sides) - Placed On A Concrete Bench With Resistance,3). Task 3 - Sidewalks A, A1, A2 And A3 (Page 104 Items 10, 11, Page 105 Item 13, 14 Bill Of Quantities) The Task Should Include In Particular: - Demolition Works (The Cubes And Edges Should Be Placed On Non-Returnable Pallets And Transported To The Józefów Commune Base At Ul. Targowa) - Reinforcement Of The Substrate (New Layers) And Its Profiling, As Well As Protection All Slopes With Galvanized Steel Mesh - Beavers Excavations (The Mesh Should Be Dug In Such A Way That It Is Below The Plant Foundations, Spot Clearing Of Bushes) - Laying Of The Pedestrian Road Surface With A Surface Made Of Granite-Like Cubes, With A Length Of 8X30 Cm In A Frame With Concrete Edges - Placed On A Concrete Bench With Resistance, - Demolition Works Of Stairs Made Of Cubes Paving Stones (The Stones And Edges Should Be Placed On Non-Returnable Pallets And Transported To The Józefów Commune Base At Ul. Targowa), Profiling And Compaction, Making Footings For The Stair Frames, Laying The Edges And Surfaces Of The Stairs With Granite-Like Cubes. - Partial Renovations Around The Spring, Repairs To Stone Damage (Replacement, Grouting, Cleaning), Cleaning And Repair Of The Existing Granite Pavement. - Renovation Works Of Barriers On The Causeway And Stairs
|