3.1 The Subject Of The Order Is The Implementation Of An Investment Called Reconstruction Of The Water Treatment Plant In Wojcieszów Based On The Functional And Utility Program Constituting Annex No. 9 To Swz.3.2 The Scope Of The Subject Matter Of The Contract Includes: 1) Preparation Of A Concept For The Reconstruction Of The Retention Tank And Horizontal Sedimentation Tank Along With Technological Installations (Water, Sewage, Automation, Power Supply, Heating, Ventilation) Based On The Guidelines Collected In The Pfu, Along With Its Approval By The Ordering Party; 2) Inventory Of Greenery Colliding With The Investment; 3) Development Of Maps For Design Purposes; 4) Obtaining All Consents, Arrangements And Decisions Necessary To Develop And Approve Documentation, Including: A) Decisions Or Other Permits To Carry Out Works In The Monument Protection And Archaeological Protection Zone, B) Water Law Decision In The Event Of The Need To Reconstruct Water Facilities, Or Perform Works Requiring Water Law Consent, C) Environmental Decision, If Necessary. (§3 Section 1 Point 71, Regulation Of The Council Of Ministers Of September 26, 2019 On Projects That May Have A Significant Impact On The Environment - Consolidated Text - Journal Of Laws Of 2019, Item 1839, As Amended). D) Decision To Cut Down Trees, E) Technical Conditions For Reconstruction, F) Technical Conditions And Ensuring The Supply Of Electricity To The Wwtp In The Event Of A Need To Change The Conditions Power Supply, G) Industry Arrangements, Including A Positive Opinion From The Coordination Meeting, 5) Preparation Of A Construction Design With Content In Accordance With Applicable Regulations, 6) Obtaining A Building Permit For The Planned Scope Of The Investment, 7) Preparation Of A Technical Design, Detailed Designs, Technical Specifications For Execution And Acceptance As Well As Bills Of Quantities, 8) Provision Of Surveying Services Consisting In Marking Out Building Structures And Current Inventory Of Sections Of The Network And Building Structures That Are To Be Covered, 9) Execution Of Construction And Assembly Works Based On The Developed Design Documentation, In The Scope Of The Retention Tank And Sedimentation Tank Designed For Reconstruction, Together With Technological Installations And Accompanying Facilities, As Well As The Supply Of Machines And Equipment Necessary To Carry Out The Task. In Particular, It Is Necessary To Ensure The Operation Of The Wwtp And The Continuity Of Uninterrupted Supply Of Water To The Water Supply Network During Construction Works,10) Carrying Out Works Related To The Reconstruction Of The Surface And Construction Of Pavements In The Wwtp Area,11) Constructing Energy Installations Supplying The Designed Technological Devices,12) Lighting, Fencing And Securing The Area During The Works,13) Carrying Out The Required Tests, Tests And Inspections Of The Constructed Buildings And Installations,14) Carrying Out An As-Built Inventory, Including Ongoin
|