|
The Subject Of The Intention Is The Construction Of A District Civil Protection And Civil Defense Warehouse And A Fire Protection Tank. Location – Strzelce Opolskie Ul. 1 Maja 59, Plot No. 158/2, 157/2, 159/1, Area Of Przedsiębiorstwo Komunikacji Samochodowej W Strzelce Opolskie Spółka Akcyjna. Basis For The Study: 1) Investors Order, 2) Map For Design Purposes, 3) Current Local Spatial Development Plan, 4) Act Of July 7, 1994 - Construction Law (I.E. Journal Of Laws Of 2026, Item 526),5) Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (I.E. Journal Of Laws Of 2022, Item 1225),6) Regulation Of The Minister Of The Environment Of June 14, 2007 On Permissible Noise Levels In The Environment (Journal Of Laws Of 2014, Item 112),7) Regulation Of The Minister Of Development Of July 12, 20222 On The Detailed Scope And Form Of The Construction Project (Consolidated Text: Journal Of Laws Of 2022, Item 1679),8) Other Applicable Construction Standards And Regulations. Existing Land Development: Plots No. 158/2, 157/2 And 159/1 Are Part Of The Database Of Przedsiębiorstwo Komunikacji Samochodowej S.A. The Entire Property Is Developed With The Following Facilities: - Warehouse Building, - Vulcanization Building, - Boiler Room, - Vehicle Inspection Station, - Transformer, - Workshop Building, - Gas Station, - Office Building, - Bus Parking Lot. Designed Land Development: In The Southwest Corner Of The Property, On Part Of Plots No. 158/2, 167/2 And 159/1, It Is Planned To Build A District Civil Protection And Civil Defense Warehouse, The Investor Of Which Is Strzelce County. Construction Equipment Related To Construction Facilities. The Following Construction Equipment Is Planned For The Construction Of A Warehouse: - A Water Tank For Fire Purposes With An Active Capacity Of 160 M3, - Construction Of A Wlz Between The Transformer Station On The Pks Plot And The Designed Building (According To A Separate Study), - Construction Of A Sanitary Sewage Connection From The Building To The Nearest Manhole On The Property (According To A Separate Study), - Construction Of A Rainwater Drainage Connection From The Existing Wells To The Designed Facility (According To A Separate Study), - Construction Of A Water Connection Between The Pks Boiler Room And The Designed Building (According To A Separate Study). Method Of Sewage Disposal. Sanitary Sewage In The Amount Of 0.5 M3/Day. Sanitary Sewage From The Building Is Discharged Into The Existing Sanitary Sewage System Located At 1 Maja Street By Connecting The Existing Network At The Pks Base. Rainwater Will Be Discharged Into The Storm Sewage System At The Pks Base. Communication System. The Communication System Will Not Change. The Entrance To The Plot Is From 1 Maja Street In The North-Eastern Corner Of The Plot. The Designed Facility Is Accessible Via The Existing Internal Communication System. Method Of Access To The Public Road. The Pl
|