Pwn Replaces The Existing Asbestos Cement Ø 500 Transport Pipe Between Valves Hrn777 And Drl192 In Blokker. To Install The New Transport Pipeline, Horizontal Directional Drilling Is Required At Three Locations. The Main Activities Are: -Performing 3 Hdd Bores St506; -Laying A Transport Pipeline St506; - Laying A Pe-Alu Distribution Pipeline; -The Construction Of An Ngij Distribution Pipeline; -Making Connections To Existing Transport Pipelines; -Making Connections To The Existing Distribution Pipes; - Closing And Filling/Damming Dilapidated Pipes; -Removing Dilapidated Pipes. Pwn Makes The Following Building Materials Available To The Contractor: Pipes, Fittings, Valves, Fire, Service And Stop Valves, Jacket Pipes With The Exception Of Steel Jacket Pipes, Outrigger Posts, Indicator Posts And Cables, As Well As All Materials To Be Processed That Are Necessary For A Good Connection, Protection And Indication Of The Materials Mentioned. Hvo100 Biodiesel Must Be Used As Fuel For All Diesel Equipment. The Details Of The Assignment Can Be Found In The Attached Specifications.
Contact Information
Contact Person
Roger van Kuijen
Address
Rijksweg 501
Contact No.
+31883616100
Email
kortgeding.haarlem@rechtspraak.nl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119263591
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.