|
Construction Work For Houses – Gu Interior Trades. Gu Interior Trades Gesobau Ag Intends To Renovate And Repair Several Groups Of Residential Buildings At Various Locations In Berlin-Weißensee Within A Radius Of Approx. 1.4 Km. Whg 3342 - Two Buildings • 4 / 2 Staircases • Kg, 4 Upper Floors, Top Floor • 44 / 16 Apartments • Living Space: Approx. 2320 / 1039 M² • Masonry Building, Hipped Or Gable Roof, Built Approx. 1958 Whg 3370 - One Building • 6 Staircases • Kg, 4 Upper Floors, Dg • 63 Apartments • Living Area: Approx. 3405 M² • Masonry Building, Hipped Or Gable Roof, Built Around 1958 Whg 3373 - One Building • 5 Staircases • Kg, 4 Upper Floors, Attic • 58 Apartments • One Commercial Unit (Ice Cream Parlor) • Living Space: Approx. 2940 M² • Masonry Building, Hipped Or Gable Roof, Built Around 1958 Whg 3432 - Two Buildings • 5 / 3 Staircases • Kg, 4-5 Upper Floors / 4 Upper Floors, Attic • 64 / 24 Apartments • Living Space: Approx. 3096 / 1622 M² • Masonry Construction, Hipped Or Gable Roof, Year Of Construction Approx. 1958 Mains Renovation Hls And Electrical With Accompanying Main Construction Work, Partial Renovation, Refurbishment Of Staircases, Basement Ceiling Insulation Trades And Selected Quantities / Sizes: Construction Site Equipment • Tree Trunk Protection 28 Pcs • Construction Fence With Provision Approx. 595 M • Sanitary Container Companies With Provision And Cleaning 6 Pcs • Sanitary Container Tenants With Provision And Cleaning 10 Pcs • Toilet Container Tenants With Provision And Cleaning 6 Pcs • Mobile Construction Toilet 6 Pcs • Construction Water Connection 22 Pcs Main Construction Work • Dismantling Tiled Stoves With Closure Chimney Opening 25 Pcs • Dismantling Partition Walls, Masonry Approx. 55 M2 • Dismantling Wall And Floor Tiles With Sealing Approx. 4,972 M2 • Closing Floor Inlets 540 Pcs • Closing Openings In Walls 207 Pcs • Fire Barrier In Wooden Beam Ceilings 236 Pcs • Shaft Walls, Facing Shells, Enclosures, Room Height 1,149 Pcs • Facing Shells Up To 1.2 M 267 Pcs Basement Ceiling Insulation • Basement Ceiling Insulation Including Work On Pipes Approx. 3,660 M2 Tiling Work • Floor Tiles With Sealing Approx. 876 M2 • Base Tiles Approx. 1,406 M • Wall Tiles With Sealing Splash Water Area Approx. 2,712 M2 Painting Work • Bathrooms, Walls And Ceiling, Filler Q3, Painting Approx. 6,110 M2 • Kitchen And Hallway, Wall And Ceiling Subareas, Q2, Wallpaper / Painting Approx. 7,042 M2 • Living Rooms, Cladding And Partial Wall Areas, Q2, Wallpaper / Painting Approx. 6,161 M2 • Stairwells Wall And Ceiling Painting Approx. 7,425 M2 • Stair Railings, Wood Overhaul Painting Approx. 684 M • Empty-We Walls And Ceilings, Partial Filling Q2, Wallpaper And Painting Approx. 9,132 M2 • Heating Pipes Painting Approx. 3,756 M Of Floor Covering • Skirting Boards Dismantling / Assembly / Replacement Approx. 721 M • Make Cut-Outs 20X55cm 722 Pcs • Add Floor Covering After Demolition Of Tiled Stove 69 Pcs • Staircases Clean And Seal Concrete Stone Steps Approx. 2,151 Pcs • Staircases Clean And Seal Concrete Stone Pedestals Approx. 991 M2 Carpentry Work • Dismantling / Assembly Of Kitchen Furniture, Stove, Sink 270 We • Adjust Worktop 270 We • Rework We Doors 270 Pcs • Shorten Door Leaf 861 Pcs • Adjustment Work On R
|