The Scope Of Renovation Works Includes:1. General Internal Construction Works - Demolition Works Of Elements Of Works Intended For Replacement; - Replacement Of Internal Internal Door Joinery; - Replacement Of Internal Door Joinery For Individual Rooms; - Painting Works - Plastering And Painting Of Walls; - Renovation Of Suspended Coffered Ceilings - Replacement Of Coffers; - Plasterboard Construction Of Walls In The Internal Gable In The Main Corridor And Installation Shaft In The Main Corridor; - Replacement Of Grilles Exhaust Mechanical Ventilation; - Replacement Of External Doors To The Entrance To The Hall From The Side Of The School Square; 2 General External Construction Works - Renovation Of The Platform At The External Door To The Back Of The Hall - Replacement Of The Platform With One Made Of Concrete Blocks; 3 Sanitary Industry Works - Replacement Of Sanitary Washbasin Faucets; - Replacement Of Shower Faucets; 4 Electrical Works - Disassembly Of Internal Electrical Installation Equipment; - Replacement Of Room Lighting Sockets; - Replacement Of Plug Sockets; - Replacement Lighting Fixtures For Led Ceiling Panels; - Carrying Out Electrical Measurements; - Moving The Internal Door Lock Controller To The Front Of The Hall. The Detailed Scope Of Works Is Specified In The Bill Of Quantities And The Design Documentation. If Trademarks, Patents Or Origin, Source Or Specific Process That Characterize The Products Or Services Provided By A Specific Contractor Appear In The Materials Describing The Subject Of The Order, It Should Be Understood That Such An Indication Is Accompanied By The Words Or Equivalent. The Ordering Party Allows Equivalent Materials And/Or Solutions Provided That The Technical, Quality And Operational Parameters Are Not Worse Than Those Indicated In The Documentation And Do Not Lead To A Change In Technology. The Names Indicated In The Documentation Should Be Treated As Examples. When Describing The Subject Of The Order By Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems, The Ordering Party Allows Solutions Equivalent To Those Described. The Contracting Authority May Not Reject A Tender Solely Because The Works, Supplies Or Services Offered Do Not Comply With The Standards, Technical Assessments, Technical Specifications And Technical Reference Systems To Which The Description Of The Subject Matter Of The Contract Refers, Provided That The Contractor Proves That The Proposed Solutions Equally Meet The Requirements Set Out In The Description Of The Subject Matter Of The Contract. The Contractor Who Refers To Equivalent Solutions Is Obliged To Demonstrate That The Solution He Offers Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches To The Offer A List Of Equivalent Solutions Along With Its Description Or Standards.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119212180
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.