|
2. The Subject Of The Order Is The Construction Of A Bicycle Path Along The District Road No. 1066R Harasiuki - Gózd Lipiński - Preparation Of Documentation. Location Of The Section Of Dp No. 1066R Harasiuki - Gózd Lipiński: - Beginning Of The Section: Km 0+998 (End Of The Road For Pedestrians And Bicycles Made Of Concrete Paving Stones0.- End Of The Section: Km 5+300 (Intersection With The Road Municipal No. 102107R Łazory - Pcb Harasiuki). Existing Condition: - Road Class - L - Road Category - District, - Road With A Bituminous Surface 5.5 M Wide, - Right Side: Bituminous And Crushed Aggregate Surface, - Left Side: Pedestrian And Bicycle Road, Bitumen And Crushed Aggregate Roadside - Surface Drainage To Roadside Ditches On Both Sides Of The Road. Design Assumptions: - Road Class L, - Road Category - District, - Beginning Of The Study: As In The Location, - End Of The Study: As In The Location, - Design: A Pedestrian Path And A Bicycle Path, - Design A Safe Pedestrian Crossing And A Bicycle Crossing Using Renewable Energy Sources To Illuminate The Crossing, - Design A Rainwater Drainage System For The Designed Road Section In A Built-Up Area, - If There Is A Public Transport Stop On The Designed Road Section Collective Bus Bay Or Platform, - Design The Reconstruction Of Culverts Under The Road, - If Necessary, Prepare Documentation For The Reconstruction Of The Existing Telecommunications And Electrical Infrastructure, - If Necessary: Obtain A Water Permit, Environmental Decision And Make All Necessary Arrangements (Polish Waters, Rdoś, Pge, Pgnig, Telecommunications, Harasiuki Commune), - Prepare And Agree With The Relevant Authorities A Permanent Traffic Organization Design, - Documentation Concept Design Must Obtain The Approval Of The District Roads Authority In Nisko, Documentation Must Be Prepared In Accordance With The Provisions Of The Act Of April 10, 2003 On Special Rules For The Preparation And Implementation Of Investments In The Field Of Public Roads (Journal Of Laws Of 2024, Item 311). Pursuant To Article 95 Of The Public Procurement Act, The Ordering Party Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing The Following Activities: Administrative Services In The Scope Of The Execution Of The Order, (Does Not Apply To Personal Performance Of Activities By The Contractor Or Subcontractor) - Pursuant To An Employment Contract In The Manner Specified In Article 22 § 1 Of The Act Of June 26, 1974, Labor Code (Journal Of Laws Of 2023, Item 1465 And Of 2024, Items 878 And 1222). Service.
|