Construction Work – Ensemble Alte Bleiche. Decentralized Electronic Instantaneous Water Heaters Are Provided For Hot Water Preparation In Both Buildings. In The “Neue Bleiche” 6 Instantaneous Water Heaters And 12 Furnishings Are Required For A Disabled Toilet, A Womens Toilet And A Mens Toilet. In The “Erlanger Haus” 4 Instantaneous Water Heaters And 7 Furnishings Are Required For A Disabled Toilet, A Womens Toilet And A Mens Toilet. A Later Expansion Of The Dg Is Already Being Prepared. The Pipe Installation Is Carried Out Using Stainless Steel Pipes In Accordance With Dvgw Worksheet W 541. The Dirty Wastewater From The “Neue Bleiche” Is Discharged Into The Public Network Via An On-Site Lifting System Above The Backflow Level. In The “Erlanger Haus” The Electricity Is Fed Directly Into The Public Network. Depending On The Progress Of Construction, Assembly In Both Buildings Is Not Continuous And Includes Assembly Interruptions; The Planned Period For Installation Until Commissioning Is Approximately 18 Months.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119197726
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.