Heat-Transfer Station Construction Work – Kesseltausch Heizzentrale Bst. 3+4. As Part Of Restructuring Measures, The Pius Hospital Oldenburg Is Planning The Construction Project For Heat Generation, Construction Stages 3+4. Essentially, The Following Work Is Required: Activation Before The Actual New Installation, The Existing Installations Are Activated And Dismantled. Dismantling/Dismantling Dismantling Of The Existing Visible Heating Installations, Essentially Consisting Of Dismantling The Pipes Including Brackets And The Existing Heat Generator. All Materials Contaminated With Pollutants Will Be Dismantled In Advance. This Means That The Kmf Insulation Is Also Dismantled By The Pollutant Remediator. The Dismantling Of Insulation Containing Kmf Is Part Of The Following Items And Must Be Carried Out By The Contractor. Trgs 521 Must Be Observed. New Installations The Work Steps For The Dismantling And New Construction Of The Heat Generation Are Shown On The Implementation Plan. The Existing Building Automation Remains Unchanged. To Supply Power To The New Heat Generation, Minor Changes Will Be Made To The Existing Control Cabinet In The Heating Center. There Is Constant Temperature Control By Each Individual Heat Generator. The Higher-Level Ga Is Not Used For Temperature Control Of Heat Generation. The Modification Work On The Existing Building Automation Control Cabinet Is Part Of This Course. The Distribution Lines In The Heating Center Essentially Remain Intact. Boiler 2 (Right Boiler) Is Shut Off At The Existing Valves/Flaps. New Distribution Lines Are Connected To These Caps And Connected To The New Heat Generators. The Downtime Of Heat Generation Is Thus Kept To A Minimum Or Avoided. After Completion Of The Installations, Commissioning Is Carried Out By The Contractor. The Building Automation Trade Is Part Of This Course. The Presence Of The On-Site Building Automation Specialist Company Is Not Planned. The Construction Project Will Be Carried Out In 2 Construction Phases. - Creation Of The Assembly Planning 12 Working Days - Approval Of The Assembly Planning 4 Working Days - Manufacturing Connections For Mobile Heat Generation 4 Working Days - Execution Before Dismantling The Boiler Must Be Planned As An Independent Operation. - Delivery Time For Mobile Heat Generation And Commissioning 5 Working Days - Delivery Time For Heating Boiler With Gas-Oil Burner 20 Working Days - Construction Site Setup/Protection Transport Routes 4 Working Days - Assembly/Assembly Of Gas-Oil Heat Generator 8 Working Days - Installation Of Exhaust System Gas-Oil Heat Generation 3 Working Days - Commissioning Of Gas-Oil Heat Generation 1 Working Day - Conversion Of Existing Gas-Oil Burner From Boiler 2 To Boiler 1 4 Working Days - Dismantling Of Existing Boiler No. 2 5 Working Days - Construction And Assembly Of The Gas Condensing Cascade 8 Working Days - Assembly Of The Exhaust System Of The Gas Condensing Cascade 3 Working Days - Commissioning Of The Gas Condensing Cascade 1 Working Day
Contact Information
Address
Georgstraße 12
Contact No.
+49 441229-1100
Email
tobias.kuhl@pius-hospital.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119196148
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.