|
Emergency Generator – Delivery Of Mobile Emergency Power Generators For The Hamburg Volunteer Fire Department. The Services To Be Provided As Part Of This Project Relate To The Delivery And Provision Of Emergency Network Systems (Nea) For Volunteer Fire Brigade Locations. The Devices Are Used To Maintain Ongoing Operational And Security Operations In The Event Of A Long-Term Power Failure As Well As To Supply Consumers At The Operational Site. All Delivery, Handover And, If Necessary, Instruction/Commissioning Services Must Be Planned And Carried Out In Such A Way That The Ongoing Operations Of The Fire Department Are Not Affected. Required Dates, Deliveries, Handovers And, If Necessary, Proof Of Functionality/Instructions Must Be Agreed In Advance With The Operator Or Planner And Announced In Good Time, As The Locations Must Remain Fully Operational At All Times. Special Requirements For Occupational Safety, Accessibility, Order And Cleanliness Must Be Taken Into Account Throughout The Entire Process. Areas Relevant To Operations, Access Roads, Set-Up And Movement Areas Must Be Kept Clear At All Times. This Tender Serves The Procurement, Delivery And Provision Of A Total Of 85 Emergency Power Systems For The Volunteer Fire Department. Some Of These Should Be Made Available Mobile On Trailers. Others Should Be Planned As A Stationary Version With The Device, For Example, To Be Able To Support Heavy-Duty Rollers. The Aim Is To Ensure A Reliable And Flexible Emergency Power Supply For Operationally Relevant Objects In The Event Of Power Outages Or Special Operational Situations. The Emergency Power Replacement Systems Are Each Intended For Operation On One Property And Must Meet The Requirements Of The Fire Service And Disaster Control Operations, Particularly With Regard To Mobility, Robustness And Operational Readiness. All Units Must Be Delivered As Operational, Emergency Power Replacement Systems And Must Be Suitable For Use By The Volunteer Fire Department. The Scope Of Delivery Includes The Following Units: • 71X Emergency Power Units, Each With An Output Of 20 Kva, In A Stationary Version, As A Compact Unit, Can Be Transported With A Crane, Forklift Or Pallet Truck. Preparatory Installation Options For Heavy-Duty Castors For Retrofitting Should Be Provided, Even If The Device Is Defined As A Stationary Solution. • 12X Emergency Generators With An Output Of 20 Kva Each, Mobile, On A Trailer Chassis With A Large Tank 250L • 2X Emergency Generators With An Output Of 32.54 Kva Each, Mobile, On A Trailer Chassis With A Large Tank 280L All Units Should Be Delivered Ready For Operation, Fully Assembled, Tested, Labeled And With Complete Documentation. Part Of The Project Is Also The Annual Maintenance Of All 85 Units, Which Must Be Carried Out In Accordance With The Manufacturers Instructions And The Relevant Legal And Technical Regulations And Serves To Ensure Permanent Operational And Operational Readiness. The Detailed Technical Requirements, Equipment Features
|