Road Construction Works – Kvp L361n Connection Via Valley Bridge And Rain Retention Basin. New Building Kvp: - Remove Approx. 266 M3 Of Topsoil, - Loosen Approx. 2,150 M3 Of Soil, - Install Approx. 650 M3 Of Soil, - Cover Approx. 400 M3 Of Topsoil, - Install Approx. Manufacture 400 M Of Drainage Pipes Made Of Plastic, - Make Approx. 50 M Of Drainage Pipes Made Of Reinforced Concrete, - Make Approx. 11 Manholes, - Make Approx Install Frost Protection Material, - Produce Approx. 1,560 T Of Asphalt Base Course From Ac 32 T S, - Produce Approx. 325 T Of Asphalt Base Course From Ac 22 T L, - Approx. 850 T Of Asphalt Binder Course From Ac 16 B S Sg, - Produce Approx. Produce 85 T Of Asphalt Surface Layer From Ac 8 D S, - Create Approx. 200 M Of Edge Edging Using In-Situ Concrete Construction, L 361 Road Renovation: - Mill Off Approx. 9,400 M2 Of Asphalt Surface And Binder Course - Mill Off And Dispose Of Approx. 600 M2 Of Pitch-Containing Fastening - Install Approx. Install 9,000 M2 Of Asphalt Binder Ac 16 Bs Sg - Install Approx. 9,300 M2 Of Stone Mastic Asphalt 8 S - Mill Off Approx. 2,550 M2 Of Asphalt Surface Layer From The Cycle/Walkway - Repair Approx.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119141225
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.