|
1. The Subject Of The Order Is The Performance Of Construction Works For The Task Titled: Construction Of A Stand For Fans With A Roof At The Mks Czarni Stadium In Jelcz-Laskowice - Stage I2.The Scope Of The Contract Includes The Construction Of A Stand For Fans With A Roof, In Particular Consisting Of: • Dismantling The Existing Plastic Seats And Installing Them In Place Of The Demolished Wooden Benches, • Liquidation/Leveling Of The Slope, • Construction Of Retaining Walls, • Preparation Of The Ground - Hardening With Concrete Cubes And Foundations For The Stands Columns, • Assembly Of The Stand And The Roof Of Sector B.3.The Detailed Scope Of The Order Concerns Stage I, Which Is Specified In The Attached Design Documentation, Excluding The Following Elements: • Stand In Sector C, • Roofing Of Stand C And The Roofing Of The Reserve Players Sector And The Medical Point, • Reserve Players Benches, • Medical Point Benches.4.Task Carried Out As Part Of The Citizens Budget 2026 Project Entitled: Construction Of A New Stand For Fans With A Roof And Waste Bins At The Stadium Of The Czarni Municipal Sports Club At Ul. Świętochowskiego 2A In Jelcz-Laskowice.5.The Description Of The Subject Of The Order Is The Design Documentation - Annex No. 12 To The Swz: 1) Area Development Design Titled: Construction Of A Stand For Fans With A Roof Carried Out In Two Stages At The Mks Czarni Stadium, Developed By: Architectural Studio, Architect Emilia Rodzińska, Wrocław, September 2026. 2) Architectural And Construction Design Titled: Construction Of The Stand For Fans With A Roof, Implemented In Two Stages At The Mks Czarni Stadium, Developed By: Architectural Studio, Architect Emilia Rodzińska, Wrocław, September 2026.3) Technical Design Entitled: Construction Of A Stand For Fans With A Roof, Implemented In Two Stages At The Mks Czarni Stadium, Prepared By: Architectural Studio, Architect Emilia Rodzińska, Wrocław, September 2026.4) Technical Specifications For The Execution And Acceptance Of Works Entitled: Construction Of A Stand For Fans With A Roof Carried Out In Two Stages At The Mks Czarni Stadium, Developed By: Architectural Studio, Architect Emilia Rodzińska, Wrocław, July 2026.5) Geotechnical Report Prepared To Determine The Ground And Water Conditions In The Area Of The Plot. No. 50, Am - 48 In Jelcz - Laskowice (Locker Room And Stands At Ul. Świętochowskiego), Prepared By: Geo-Pw Geological Services Przemysław Wszędybył, M.A., April 2026. 6) Decision Building Permit No. 637/2026 Of September 23, 2026. 7) Bill Of Quantities (Illustrative Document).8) Drawing Mon. “Scope To Be Done”
|