The Subject Of The Order Is The Renovation Of Drainage Ditches Damaged During The Flood In Poland In September 2024. The Scope Of The Order Includes The Execution Of 5 Tasks: Task No. 1: Renovation Of Drainage Ditch No. L-15. The Task Will Be Carried Out In The Location: Plots Registered As No. 203 A. M. 1237/4 A. M. 8, Markowice Precinct In Racibórz. The Scope Includes In Particular: A) Mowing The Bottom, Slopes Of Ditches And 1-Meter-Wide Strips Adjacent To The Slopes On Both Sides Of The Ditch (The Maximum Height Of The Lichen Left Is 5 Cm), 80% Of The Swath Should Be Raked And Removed On The Same Day (The Collected Swath Should Be Transferred To The Composting Plant In Racibórz Along With Appropriate Storage Fees And Documentation With A Waste Transfer Card) - Surface Intended For Mowing Is Approximately 10,518 M2, B) Desilting The Bottom Of The L-15 Ditch With A Width At The Bottom Of 0.6-1.2 Meters And A Depth Of 0.8-1.8 Meters - The Silt From The Desilting Should Be Managed In Accordance With The Requirements Of The Waste Act (Transferred To An Entity With Appropriate Authorizations Along With Incurring Appropriate Fees Or Obtaining An Appropriate Decision For Development) - Desilting Is Planned Along The Entire Length Of The Open Ditch (1843 M) Up To 30 Cm, C) Desilting Of Culverts And Collectors With A Total Length Of 127 M And A Diameter Of 0.40-1.30 Meters - It Is Planned To Desilt Culverts And Collectors With Medium Silting Up To 1/3 Of Their Height. Task No. 2: Renovation Of Drainage Ditch No. Racibórz. The Scope Includes In Particular: A) Mowing The Bottom, Slopes Of Ditches And 1-Meter-Wide Strips Adjacent To The Slopes On Both Sides Of The Ditch (The Maximum Height Of The Lichen Left Is 5 Cm), 80% Of The Swath Should Be Raked And Removed On The Same Day (The Collected Swath Should Be Transferred To The Composting Plant In Racibórz Along With Appropriate Storage Fees And Documentation With A Waste Transfer Card) - Surface Intended For Mowing Is Approx. 13,172 M2, B) Desilting The Bottom Of The D-9 Ditch With A Width Of 0.4-0.8 Meters At The Bottom And A Depth Of 1.0-1.7 Meters - The Silt From The Desilting Should Be Managed In Accordance With The Requirements Of The Waste Act (Transferred To An Entity With Appropriate Authorizations Along With Incurring Appropriate Fees Or Obtaining An Appropriate Development Decision) - Desilting Is Planned Along The Entire Length Of The Open Ditch (2445 M) Up To 30 Cm (Including Approx. 260 M Of Manual Desilting), C) Desilting Of Culverts And Collectors With A Total Length Of 224 M And A Diameter Of 0.6-1.4 Meters - It Is Planned To Desilt Culverts And Collectors With Medium Silting Up To 1/3 Of The Height; D) Grubbing Up A 260 M Long Ditch From Ul. Floriana (Behind Property No. 18) To Ul. Bojanowska (At The Height Of Property 26), E) Stabilization Of The Banks In The Drainage Ditch Behind The Property At Ul. Floriana No. 18 Over A Length Of Approx. 40 M, By Using Stone Riprap Separated From The
Contact Information
Address
City Of Racibórz,Racibórz,47-400,Śląskie,Pl227 - Rybnicki
Contact No.
0327550710
Email
zamowienia@um.raciborz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119137614
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.