Excavation By Throwing The Soil Outside The Trenches With Reverse Bucket Excavators With A Bucket Capacity Of 0.5 (0.5-0.63) M3, Soil Group: 3, Laying A Pipeline From Non-Pressure Chrysolith Cement Pipes, Diameter: 300 Mm To 400 Mm, Non-Pressurized Asbestos-Cement Pipes, Conventional Passage 400 Mm, Inner Diameter 368 Mm, Making The Foundation Under Pipelines: Crushed Stone, Construction Of The Concrete Preparatory Layer (Concreting Of The Bottom, Side And Top Of The Pipe), Manual Filling Of Ditches, Pits And Pits, Soil Group: 2, Excavation Of Soil With Excavators With A Capacity Of 0.5 (0.5-0.63) M3 Of Chalovun By Loading It Onto Dump Trucks, Transportation Of Cargo With Dump Trucks Working Outside The Quarry With A Carrying Capacity Of 10 Tons (Code 400052). Transport Distance-5 Km. 1St Class Cargo, Manual Digging Of Soil In Sloped Trenches Up To 2 M Deep Without Fasteners, Installation Of Road Signs In Frame Metal Constructions: П-Shaped, Heavy Concrete В25 (М350), Metal Profil 100 X 100 X 5Mm Pl.3Sp, Covering The Wall With Sheets Of Decorative Layered Paper, Plastic Or Synthetic Materials: Wood On The Grid, Manual Loading And Unloading Of Soil From Dump Trucks To Vehicles (Carriage Of Soil To A Distance Of 80 M), Laying Of Non-Pressure Pipelines From Polyethylene Pipes, Diameter: 500 Mm
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118901588
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.