Operation Of Electrical Installations – Operation Of The Bnm Electricity Network 2027-2030. Bábolna Nemzeti Ménesbirtok Wants To Outsource The Standby Tasks Of The Electricity Supply System Under Its Asset Management, As Well As The Repair Work Caused By Malfunctions, As Well As The Planned Maintenance And Renovation Tasks. Standby Time: 0-24 Hours On Working Days, Weekly Rest Days, Sundays And Holidays. Facilities, Equipment And Extent Of Standby Affected By Standby: - I-Ii-Iii Starting From Kisigmánd 120 Kv Station. 22 Kv Backbone Lines, Including The Outgoing Terminals Of The Ásár Connecting Equipment, - No. 1. Transformer Stations Listed In The Annex /Including The Part Up To The Outgoing 0.4 Kv Terminals/ - Dióspuszta External /Starting From The Tata-Mocsa 22 Kv Line Branch/ And The Internal 22 Kv Line - 22 Kv Elements In Front Of The Transformer Stations - Dióspuszta Ménes, Ölbő, Csikótelep Internal 0.4 Kv Network And Switching Equipment. - The Internal 0.4 Kv Power Transmission Network Of The Facilities Under The Asset Management Of Ménesbirtok - Park And Public Lighting / Exhibition Space, Rákóczi U. Area Bounded By Jókai U.-Erzsébet U.- Tárkányi U.- Mészáros U. Work Regulations: Troubleshooting, Repair, And Maintenance Work To Be Performed On The Devices And Facilities Of The Electrical Network Must Be Performed Based On The Relevant Standards And Professional Regulations, For Which The Contractor Is Required To Consult In Advance. The Minimum Number Of Personnel Required To Maintain Daily Readiness: 1 Person On Standby (Permanent Mobile Phone Availability) 2 Persons 20 And 0.4 Kv Network Installer Method Of Notification Of A Fault In The Electrical Network: E.On., The Bábolna National Stud Farm Or The Facilities Supplied With The Electrical Network Notify The Contractors On-Call Employee By Telephone On The Telephone Provided By The Contractor. Regulations For The Elimination Of Faults In The Electrical Network: Given That The Electrical Network Also Supplies Livestock Farms Where Even Short-Term Power Outages Can Lead To The Death Of The Animals There, The Elimination Of Faults Due To Malfunctions Or Other Reasons Must Be Started As Soon As Possible And Completed Within The Shortest Possible Time. Remuneration For Standby And Completed Work: The Consideration For The Work Performed During The Standby Period Is Included In The Standby Fee, Excluding The Cost Of Installed Materials. Planned Maintenance On The Electrical Network Is Paid For At The Unit Price Specified In The Contract For The Given Device Or Equipment - To Be Concluded After The Public Procurement. Remuneration For Ad Hoc Repairs To Be Carried Out On The Electricity Network Takes Into Account The Overhead Rate Fixed In The Contract To Be Concluded After The Public Procurement. The Materials To Be Installed Can Be Accounted For According To The Actual Use Of Materials Certified By The Bábolna National Stud Farm. Duration Of The Contract To Be Concluded: The Contract To Be Concluded Is Successfully Completed By Public Procurement
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118887820
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.