Industrial Machinery – Lot 1 Hydraulic Control And Distribution Line Auxiliary Systems Pradella Power Plant. Engadiner Kraftwerke Ag Is Renewing The Hydraulic Water And Oil Control Systems Of The Four Francis Turbines At The Pradella Power Plant, Which Have Been In Operation Since The Early 1970S. The Subject Of The Order Is In Particular The Planning, Design, Manufacture, Delivery, Assembly, Testing And Commissioning Of The New Hydraulic Units, Pipelines And Associated Components For Controlling The Ball Valves, Nozzle Servo Motors And Pressure Regulators. The Order Also Includes The Renewal Of The Pressure Shaft Emptying And The Pressure Shaft Residual Emptying, The Control Line And The Inspection Slide For The Irrigation System. Also Part Of The Scope Of Services Are All Necessary Dismantling, Dismantling And Disposal Work On The Existing System Parts As Well As The Necessary Documentation, Coordination And Verification Services. The Renovation Is Intended To Ensure The Operational Safety, Availability And Economic Viability Of The Power Plant In The Long Term.
Contact Information
Address
Mugliné 29
Contact No.
+41795414377
Email
fabian.denoth@ekwstrom.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118860134
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.