|
1.1 The Subject Of The Order Is The Preparation Of Complete Design Documentation And The Implementation Of Construction And Assembly Works In The Design And Build Formula For The Task Of Revitalizing A Post-Industrial Building And Transforming It Into A Modern Cultural And Social Center In Accordance With Annex 1 - Functional And Utility Program With Annexes.Location Of The Property: The Construction Project Is Located At Ul. Sucharskiego 14, 33-200 Dąbrowa Tarnowska, Registry No. 61/6, Dąbrowa District In The Lesser Poland Voivodeship. General Identification Of The Planned Works Include: - Partial Demolition Of The Current Buildings And Reconstruction Of The Building To Four Floors, - Allocation Of The Ground Floor And First Floor For Cultural Activities, Including Spaces For Organizing Painting, Sculpture, Theater Workshops And Other Local Events Cultural Center, - Adaptation Of The Second Floor For The Needs Of Local Non-Governmental Organizations, By Creating Office Rooms And Rooms For Social Activities, - Locating A Conference Room On The Top Floor That Can Serve As A Show And Cinema With Catering Facilities, - Creating A Relaxation Space Around The Building, With Greenery And Small Architecture, - Adapting The Building To People With Disabilities, Providing Them With Convenient Access To Infrastructure, - Land Reclamation, Removal Of Concrete Elements And Tin Garages And Construction Of A Parking Lot Available To Visitors, - Construction Of A Small Outdoor Stage With A Roof/Concert Shell As A Place For Organizing Outdoor Concerts, - Modernization And Reconstruction Of Other Facilities On The Property For Cultural And Social Activities, 1.2.The Scope Of The Investment Includes The Reconstruction Of The Building In Order To Transform It Into A Modern And Multifunctional Cultural And Social Center, It Is Necessary To, Among Others:● Carry Out Construction And Finishing Works Of The Building While Maintaining Its Shape And Industrial Character,● Create A New Functional Layout Inside The Facility,● Ensure Full Communication Accessibility For People With Disabilities (In Accordance With The Architectural Standard) Through, Among Others, The Construction Of A Passenger Lift,● Carry Out Construction Works On External Spaces: Courtyard, Small Stage, Grounds Green, ● Execution Of The Following Installations: Water And Sewage, Central Heating, Electrical, Fire Protection, Ventilation And Air Conditioning, ● Full Equipment Of Interior And Exterior Spaces. In Addition: - Preparation Of A Set Of Acceptance Documentation In 2 Copies. The Documentation Must Be Provided To The Investor No Later Than On The Day Of Investment Completion;- Carrying Out Tests And Final Tests For The Entire Scope Of Works And Installations Performed As Part Of The Investment Task;- Preparation Of Post-Construction Geodetic Inventory;- Preparing An Application To The Competent Building Supervision Inspector For Issuing An Occupancy Permit In Accordance With The Requirements Of Co
|