• Preparatory Works, Including Clearing Of Plants, Felling And Destumping Of Trees, Removal Of Invasive Exotic Species And Demolition Of Existing Pavements, Structures, Fences And Drainage Infrastructure; • Earthworks, Including Excavations, Excavations, Embankments, Relief Formation, Earth Moving, Processing Of Released Soil And Construction Of Wadis; • Construction Of Sub-Foundations And Foundations For Pavements And Linear Elements; • Construction Of Concrete Pavements, Cobblestone Pavements, Permeable Pavements And Crushed Stone Pavements; For The Concrete Paving Of The Bicycle Highway, The Limited Available Work Space Must Be Taken Into Account, Which May Make The Execution Of The Works Less Efficient; • Construction Of Pipes, Street Gullies And An Overflow Construction; • Installing Linear Elements Such As Curbs, Edge Barriers, Traffic Guides And Parking Stops; • Installing Fences And Access Gates; • Supply And Installation Of Park Furniture, Information Boards, Cycling Infrastructure And Other Design Elements; • Carrying Out Signaling And Marking Works; • Carrying Out Landscaping, Including Soil Improvement, Sowing, Planting Trees, Hedges, Forestry, Fruit Trees And Bank Vegetation; • Maintenance Of The Landscaping During The Guarantee Period, Including Mowing Management, Watering, Replacing Dead Plants And Other Maintenance Works. The Works Are Being Carried Out In An Area With Important Utility Lines (Fluxys, Air Liquide, Etc.) And A Working Sports Complex, Whereby Possible Implementation Difficulties, Nuisance And Efficiency Losses Must Be Taken Into Account As A Result Of The Limited Work Options And The Necessary Coordination With The Existing Infrastructure And Activities.
|