Substation Construction Work – (Provia Id 161711) Uw Landeck; Uw Landeck - Master Builder Work. The Project In Question Includes The Construction Of A New Substation At The Same Location With The Ability To Be Switched Off In Thirds And The Use Of A Mobile Substation. The New Building Consists Of A 15 Kv Switchgear Building And Waiting/Scaffolding Room, A 15 Kv Metal-Enclosed System, A 110 Kv Outdoor Switchgear With Three 110/15 Kv Transformers, A 15 Kv Switchgear With Cable Collector Including All Ancillary Equipment. The Landeck Substation Will Be Renovated On Site In Two Construction Phases. During The First Renovation Phase, One Third Of The Existing System Will Continue To Be Operated By An Fuw And The Existing Overhead Line Switchgear. During This Time, The 110 Kv Traction Power Line Pettneu 2 – Ötztal 2 Will Be Looped Through On The Transmission Line Mast No. Ld 2. The Front Part (U3) And The Middle Part (U2) Of The System Will Be Taken Out Of Operation. After Rebuilding The Front Two Thirds (U3, U2) Of The Open-Air System And Putting It Into Operation With The New 15 Kv System, Including New Switchgear, The Rear Third (U1) Will Be Rebuilt. In This Second Phase Of Reconstruction, The 110 Kv Traction Power Line Pettneu 1 – Ötztal 1 Will Be Ground Through On The Transmission Line Mast No. Ld 1. The New 110 Kv Outdoor Switchgear Is Designed In A Longitudinal Series Design As A Double Busbar System With An Overhead Busbar And 2 Longitudinal Divisions With A Coupling. The Transformers Are Delivered To The System On A Track. The Entire Earthing System For All Parts Of The System Is Installed In Accordance With The Applicable Regulations And Standards, Taking Into Account The Öbb Regulations And The Technical Specifications For Switchgear. The Substation Building Corresponds To Building Class 1 According To The Valid Oib Guidelines. Surface Drainage Of Paved Areas, Including Roads, Is Carried Out Via Infiltration On The Propertys Own Land. The Roof Water Is Channeled Into A Newly Constructed Seepage Shaft And Allowed To Seep Into The Ground. There Is No Permanent Workplace Planned In The New Premises. The Following Existing System Components Will Be Replaced: 15 Kv Uw Switching Frame. Complete 110 Kv Outdoor Switchgear. Uw – Track. Uw Building. All Work Must Be Carried Out Taking Into Account The Existing Infrastructure, Applicable Standards And Project-Specific Requirements. The Planning Services Include The Creation Of Site And Section Plans, Static Proofs, Formwork And Reinforcement Plans As Well As Service Specifications For The Subsequent Tendering Of The Construction Services.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118627679
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.