|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Edd, Saifai; Electrical System Or Installation; As Per Boq - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Edd, Saifai Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Stp 55 Pole 13 Mtr. , Stp 55 Pole 11 Mtr. , Carriage Of Line Materials I.E. 33 Kv / 11 Kv Cable, Stay Rod, Pin Insulator / Disc Insulator, 33/11 Kv Cross Arm, Dropper Channel, Top / T-Off Channel, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By Stp 55 Pole 13 Mtr. Long Including Fixing Complete 33 Kv/11 Kv/Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By Stp 55 Pole 11 Mtr.Long Including Fixing Complete 33 Kv/11 Kv/Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Grouting Of 13/11 Mtr. Long Stp 55 Poles, Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. (All Labour, T&P, Grouting Material Etc Arrenged By Contractor On His Own Cost). , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Laying, Sagging, Stringing, Jumpering And Binding Etc. Of Acsr Dog Conductor In 11 Kv / 33Kv Lines As Per Resspo Manual As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work , Carriage And Digging, Laying And Back Filling Of Following 33 Kv & 11 Kv Xlpe Sutaible Size Xlpe Cable Including The Cost Of Cable Hoisting And Making Loops/Hdpe Pipe/Gi Pipe 6 Dai /Cl S Etc. Required For Proper Completion Of The Work As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. , 11 Kv Xlpe Cable Al.3X185 Sqmm , 33 Kv Xlpe Cable Al. 3X300 Sqmm , Lt Xlpe Cable 3.5X150 Sqmm , 11 Kv Xlpe Alluminium Cable 3.5X120 Sqmm , Carriage And Filling Of 11 Kv Heat Shrinkable Jointing Kit 3X185 Sqmm (Outdoor Type) For Compeletion Of Work. Including Cable Hoisting Jumfering Work Etc. , Carriage And Filling Of 33 Kv Heat Shrinkable Jointing Kit 3X300 Sqmm (Outdoor Type) For Compeletion Of Work. Including Cable Hoisting Jumfering Work Etc. , Carriage And Fixing Of Following Ancillary Equipment, Accessories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , M.S. Bracing Angle , 11 Kv Top Channel , 33 Kv Top Channel , 33 Kv X-Arm Cl , T-Off Channel , F- Cl , Dropper Channel , Stay Insulator , Nut & Bolt , 11 Kv Disc Fitting , 33 Kv Disc Fitting Complete , 33 Kv Pin Insulator , 11 Kv Disc Insulator , Stay Cl , Dp Cl , Lt Shackle Insulator 75X90 Mm , Dp Cl For Stp , Lt Cl For Stp , Stay Wire 6 Swg/10 , Stay Wire Gi (7/3.15 Mm) 7/10 Swg. , Lug Alluminium 120 Sqmm , Hdpe Pipe 120 Mm , Hdpe Pipe 140 Mm , Gi Pipe 6 Dai , Dismantling And Removal Of Existing Line (Conductor/Pole) From The Various Area Preparing Their Coils And Then Stacking In The Respective Jes (Store) Direction Of Engineer Incharge. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc.Required For Proper Completion Of Work.
|