Tender For Regarding The Execution Of Various Essential Works In Kachhpura Under Division No. 02-1 Demolishing R.C.C. Work Manually/ By Mechanical Means Including Stacking Of Steel Bars And Disposal Of Unserviceable Material Within 50 Meters Lead As Per Direction Of Engineer-In-Charge. 2 Demolishing Cement Concrete Work Manually/ By Mechanical Means Including Stacking Of Steel Bars And Disposal Of Unserviceable Material Within 50 Meters Lead As Per Direction Of Engineer-In-Charge. 3 Earth Work In Excavation For Foundation, Trenches For Pipes / Cables Or Drains Etc. By Mechanical Means/Manual Means (Exceeding 30Cm In Depth.) Including Ramming Of Bottom, Dressing Of Sides, Disposal Of Excavated Earth Including Of All Lift And Lead Upto 50M. Disposed Earth To Be Levelled And Neatly Dressed. All Kinds Of Soil 4 3.3 Roadwork In Soil Excavation For Roadwork In Soil With Hydraulic Excavator Including Cutting And Loading In Tippers, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross Sections, And Transporting To The Embankment Location With All Lifts And Lead Up To 1000 M As Per Section-300 Of The Specifications. 5 Supplying And Filling In Plinth Either Crusher Stone Dust/Coarse Sand Under Floors Including, Watering Ramming Consolidating In Layers Not Exceeding 20Cm In Depth And Dressing Complete Crusher Stone Dust. 6 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering With 40Mm Nominal Size Grade M 10 Cement Concrete Grade M-10 (Nominal Mix) With 20 Mm Maximum Size Of Stone Aggregate 7 Reinforcement For R.C.C Work Including Straightening, Cutting, Bending, Placing In Position And Binding Including Cost Of Binding Wier Upto Floor Two Level Including All Wastage Etc. Complete. Mild Steel And Medium Tensile Steel Bars. 8 Centering And Shutting Including Strutting, Propping Etc. And Removal Of From For Wall Foundations, Footings, Bases Of Column, Etc For Mass Concrete. 9 Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement All Work Up To Plinth Level Cement Concrete Grade M-20 (Nominal Mix) With 20 Mm Maximum Size Of Stone Aggregate. 10 Providing And Fixing 40Mm Thick Red Stone Slab Over Drains Including Pointing In Cement Mortar 1:3 (1 Cement: 3 Sand) 11 Providing And Laying In Position Specified Grade Of Cement Concrete Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement All Work Up To Plinth Level: Cement Concrete Grade M-20 (Nominal Mix) With 20 Mm Maximum Size Of Stone Aggregate. 12 Steel Work Welded In Built Up Sections/Framed Work Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer Using Structural Steel Etc. As Required. 13 Providing And Laying 60Mm Thick Factory Made Cement Concrete Interlocking Paver Block Of M-30 Grade Reflective Type Rubber Modulded Glossy Colour Paving Block Made By Block Making Machine With Strong Vibratory Compaction And Of Approved Size And Shape Laid In Required Colour And Pattern Over And Including 50Mm Thick Compacted Bed Of Stone Dust/Sand Filling The Joints With Sand Etc. All Complete As Per The Direction Of Engineer In Charge Including Locking Edges Wherever Required With Cement Concrete M15 Grade Or Cement Mortor 1:3 With Pigment Of Required Shade To Match The Colour/Shade Of Block Including Cost Of Labour, Material, Etc. All Complete. 14 12 Mm Cement Plaster Of Mix: 13.1.1 1:4 (1 Cement: 4 Sand) 15 10.10 Repair Of Pot Holes By Removal Of Failed Material, Trimming The Sides To Vertical And Levelling The Bottom, Cleaning The Same With Compressed Air Or Any Appropriate Method Filled With 75Mm Bituminous Macadam, Applying Bitumen Tack Coat At The Bottom And Vertical Sides As Per Section 3004 Of The Specifications. 16 4.1 Construction Of Granular Sub-Base By Providing Coarse Graded Material (Cbr>30), Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method At Omc And Compacting With Vibratory Roller Of 80-100 Kn Static Weight To Achieve The Desired Density, Complete In All Respect As Per Relevant Clauses Of Section-400. 17 2.18 Supplying And Filling In Plinth Under Floors Including, Watering, Ramming Consolidating And Dressing Complete. 2.18.1 Moorum/Hard Copra 18 Supplying And Filling In Plinth Either Crusher Stone Dust/Coarse Sand Under Floors Including, Watering Ramming Consolidating In Layers Not Exceeding 20Cm In Depth And Dressing Complete. Crusher Stone Dust. Providing And Laying Cement Concrete Grade M-20 With 20 Mm Graded Crushed One Aggregate, Mixing Shall Be In Mechanical Mixer, Laying With Paver Compacting By Use Of Pin, Plate/Screed Vibrators Including Form Work By Strong Steel Girders Fixed By Kes, Separation Membrane 125 Micron Thick, Including Cutting Of Joints @ 4 To 5 M Interval And Filling It With Hot Applied Bituminous Sealant (Without Dowel Bars) (Max. Hickness 20 Cm). Upply Of Mineral Aggregate Like Broken Stone/Crushed Stone/Stone Dust/Moorum At Mad Site Including All Lead And Stacking Etc. Complete9.1.5 22.4Mm Standard Size Crushec Ne 1.7 11.2Mm Standard Size Crushed Stone 1.8 6.7Mm Standard Size Crushed Stone 1.10 Moorum With Cbr Not Less Than 7 1.9 Crusher Stone Dust 15 Steel Work In Built Up M.S. Tubular Section (Round, Square Or Rectangular Hollow E Etc.) Trusses/Frame Work Etc./Railing Work Etc. Including Cutting, Hoisting Fixing In Ition And Applying A Priming Coat Of Approved Steel Primer, Welded And Bolted Uding Special Shaped Washers Etc. Complete. 10.15.1 Hot Finished Welded Type Tubes.
|