Construction Work For Buildings Relating To Education And Research – Building Construction For The Construction Of A New Extension Building With A Flat Roof And A Connecting Building With A Pent Roof. - Construction Site Equipment For Your Own Trade, Among Other Things: Oo Construction Crane With Crane Parking Space, As A Top-Slewing Crane With A Total Reach Of 50 M, Also For Use By Other Trades. With A Payload Of Approx. 3.7 T With A Reach Of Approx. 25 M And Approx. 2.5 T With A Reach Of 35 M. Fbv System, Among Other Things: O Fbv Foil Horizontally Approx. 145 M2, O Fbv Foil Vertically Approx Stb Individual Foundations Approx. 49 M3,O Stb Strip Foundations And Pressure Beams Approx. 42 M3,O Stb Floor Slabs With 2 Steps And 3 Plate Thickenings Approx. 123 M3,O Stb Retaining Walls Approx. 22 M3,O Stb Supports Approx. 8 M3,O Column Head Reinforcement Inside + Edge Mushroom For Ceiling D=55Cm, 10 Pieces, O Stb External Walls, D = 25Cm, In-Situ + Exposed Concrete Approx. 317 M2, O Stb Inner Walls, D = 25 And 20Cm, In-Situ + Exposed Concrete Approx. 294 M2, O Stb-Ft Stairs, 2 Floors Ug-Og1, 4 Flights = 37 Stg Mass Incl. 2 Stb-Ft Platforms Approx. 7.5 M3o Stb Beams, In-Situ And Exposed Concrete Approx. 1 M3,O Stb Ceiling 55Cm Approx. 288 M3,O Stb Ceiling 25-30Cm, Stair Pod. 22Cm In-Situ + Exposed Concrete Approx. 68 M3,O Reinforcing Steel Bars Bst 500 S (B) 8 - 25 Mm, Including Small Quantities Approx. 112 T,- Insulationamong Other Things:O Load-Bearing Perimeter Insulation And Bopla D=16Cm Approx. 155 M2,O Perimeter Insulation Outer Wall D=16Cm Approx. 315 M2,O Bubble Wrap Approx. 375 M2, - Elt, Earthworks And Concrete Insertion Work, Etc. Among Other Things: O Double Sealing Packing Introductions Approx. 6 Pieces, O Earthworks, Trenches, Channels And Shafts And Backfilling Approx. 75 M3, O Soil Disposal Approx. 28 M3, O Cable Protection Pipes Approx Concrete Ceiling Approx. 18 M, Rw Pipe, Sewer Drain Pipe In The Area Of The Supporting Wall Approx. 45 M, Earthworks, Trenches, Channels And Shafts And Backfill Approx. 45 M3
|