Thermal Modernization Of The Primary School Building In Nowa Wieś. A Detailed List Of Works Included In The Scope Of The Contract Is Presented In The Specification Of The Terms Of The Order, Design Documentation, Bill Of Quantities And Technical Specification For The Execution And Acceptance Of The Works. The Subject Of The Order Should Include: • Preparation Of The Construction Site (Including Traffic Organization In The Construction Surroundings, Implementation Of Traffic Organization For The Duration Of Construction, Arrangement And Agreement At The Own Expense Of The Location Of The Construction Facilities Along With The Costs Of Connecting And Using Water And Electricity).• Demolition Works, Among Others. Dismantling The Attic Insulation Made Of Mineral Wool Boards, Dismantling Window Blinds, Roof Covering, Flashings, Eaves Gutters And Downpipes.• Installation Of Roof Covering, Gutters, Sheet Metal Flashings.• Insulating The Flat Roof With Mineral Wool Of Thickness. 25Cm.• Replacement Of External Doors To The Building.• Installation Of External Window Sills.• Insulation Of The Plinth Walls With A Layer Of Extruded Polystyrene, Thickness. 15 Cm.• Thermal Modernization Works Of External Walls With A Layer Of Styrofoam Thickness. 15 Cm.• Insulation Of Window Jambs And Window Sills With Polystyrene Boards. 2 Cm.• Façade Made Of Silicone Plaster With High Water Vapor Permeability With A Sheep-Like Structure With A Grain Size Of 1.5 Mm.• Installation Of Canopies Over Polycarbonate Entrances On A Steel Structure.• Replacement Of Sidewalk Surfaces.• Construction Of A Band Around The Building.• Disassembly And Reconstruction Of External Stairs.• Construction Of A Ramp For The Disabled.• Installation Of A Steel Stair Railing.• Installation Of: A Photovoltaic Installation With A Power Of 450Wp (Located On The Roof Of The Primary School Building), Rpv Cabinet With A Disconnector Equipped With An Undervoltage Coil That Disconnects The Voltage In The Event Of A Power Outage In The Network.• Construction Of The Buildings Lightning Protection System.• Disassembly And Reassembly Of The Existing Cameras On The Facade And The Internet Relay Antenna On The Roof.• Necessary Tests And Measurements.• Preparation Of As-Built Documentation Along With A Surveying Inventory. As-Built In Paper And Electronic Versions - 2 Copies • Preparation And Submission To The Ordering Party Of A Set Of Documents Constituting Proof Of Proper Performance Of The Subject Of The Contract (Certificates, Technical Approvals, Research, Test And Inspection Reports, Warranty Cards, Quality Certificates, Instructions For Use And Maintenance, Etc.) - 2 Sets. Note: The Sheet Metal Together With The Roofing Sheet Metal Flashings Are The Property Of The Investor And Will Be Deposited After Disassembly At The Location Indicated By The Investor. Place. The Window Blinds Are The Property Of The Primary School In Nowa Wieś And After Dismantling They Will Be Placed In A Place Indicated By The Principa
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118607771
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.