|
1. The Subject Of The Order Is A Task Covering The Modernization Of The Sports Complex Called Modernization Of The Sports Facility At The Primary School At Ul. Józefa Piłsudskiego 139 In Zagórz.2.A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1 To The Swz - Description Of The Subject Of The Order, Bill Of Quantities, Drawing No. 1.3.The Contractor Will Perform The Works In Accordance With Applicable Laws, Standards, Principles Of Sound Technical Knowledge, And Under The Conditions Set Out In The Contract.4.The Scope Of Construction Works Includes: Dismantling: • Polyurethane Surface [330.00 M2] - Dismantling Should Be Carried Out In A Way That Would Least Interfere With The Substructure - The Substructure Is To Be Left. • Nets On Ball Catchers, 4.0 M High, Around The Pitch - The Ball Catcher Posts Are To Be Left In Place, • Sports Equipment • A Strip Of Hardened Concrete Cubes Along The Longer Edge Of The Pitch, 80 Cm Wide. A New Polyurethane Surface Will Be Applied On The Prepared Subfloor. The Existing Surface Is Heavily Worn And Requires Replacement. After Dismantling The Surface Layer Of The Pitch, The Edges Should Be Cleaned Of Weeds And Other Debris. After Dismantling A Fragment Of The Hardened Strip Of Concrete Cubes Along The Long Edge Of The Pitch, The Entire Pitch Should Be Moved Northwards In The Direction Of The Pitch Axis. Underneath The Fragment Of Dismantled Concrete Cubes, The Sub-Base Should Be Supplemented In Accordance With The Existing Layers Of The Pitchs Sub-Base, I.E. 1-4 Mm Grit, 3 Cm Thick. The Planned Move Is Mainly Intended To Profile The Collapsed Corner, But Also To Protect The Facility Against Possible Sliding With The Slope, Damage To The Pitch Due To The Current Arrangement And To Increase The Safety Of The Users Of The Sports Facility. The Surface Material Used Should Meet The Following Requirements: Spray System Thickness ≥ 13.0 Mm Selected Technical Properties Of The Surface In Accordance With The Pn En 14877: 2014 Standard Or Equivalent Properties Required Value Tensile Strength, N/Mm2 (Mpa) ≥ 1.1 Relative Elongation At Break, % ≥ 75 Tensile Strength, After Aging, N/Mm2 (Mpa) ≥0.72 Relative Elongation At Break, After Aging, % ≥67 Shock Absorption, Force Reduction, (23°C), % 35-50 Shock Absorption, Force Reduction, After Aging (23°C), % ≥39 Vertical Deformation, (23°C), Mm ≤1.7 Abrasion Resistance In Taber Test, G ≤0.6 Resistance To Artificial Aging Assessed By Color Change (Gray Scale); (Test Method Pn-En 20105-A02:1996) ≥4Sliding Resistance, Pendulum Test, Cen Slider, C Scale, Ptv Unitsdry Surface 80-85Wet Surface 55-59The Investment Includes The Replacement Of The Net Along With The Renovation Of The Existing Ball Catch Posts According To The Scope Described In The Opz Document. It Is Planned To Supplement The Existing Sports Equipment With New Or Replaced Ones Elements:A. Installation Of Basketball Hoops, 2 Piecesb. Replacement Of Ball Nets H= 4 M, 52 M.C. Hybrid Ball Catcher 2M
|