|
1. The Subject Of The Order Is The Performance Of Construction Works Related To The Construction Of A Multi-Functional Sports Field With A Polyurethane Surface In The Town Of Mołodycz, Intended For Handball, Basketball, Volleyball And Tennis, With Construction Equipment On The Plot No. 513 In The Town Of Mołodycz, Wiązownica Commune. Playing Field 20.00 X 40.00 M With A Safety Zone Of 2 M Around The Pitch. Total Dimensions Of The Pitch 24.00 X 44.00 M, Including: - Basketball Court 15.10 X 22.00 M - Handball Court 20.00 X 40.00 M - Volleyball Court 9.0 X 18.00 M - Tennis Court 10.97 X 23.77 M 2) Substructure: Permeable Substructure. All Elements In Accordance With The Properties Specified In The Design Documentation. The Works Should Be Carried Out In Accordance With The Technical Specification For The Execution And Acceptance Of Construction Works. Multi-Purpose Playing Field Surface. Polyurethane Surface With The Properties, Parameters And Installation Technology Specified In Point 11 Of The Descriptive Part Of The Design Documentation Basketball - Adjustable Single-Post Stands With A Reach Of At Least 120 Cm - 2 Pieces - Basketball Hoop Mounted In Sleeves, - 2 Pieces - Epoxy Basketball Backboard, Dimensions: 105 X 180 Cm, - 2 Pieces - Height Adjustment Mechanism, - 2 Pieces - Volleyball, Handball And Tennis Equipment - Posts. For Volleyball, Aluminum, Adjustable (Badminton, Volleyball), - 2 Pieces - Volleyball Net, - 1 Piece - Tennis Posts, - 2 Pieces - Tennis Net, - 1 Piece - Handball Goals, - 2 Pieces - Handball Goal Net, - 2 Piecesall Equipment Should Be Mounted In Sleeves.3) Area Fencingfence Of The Pitch, 5 M High, Made Of Steel Mesh Coated With Meshes 35X35 Mm With An Entrance Gate And An Entrance Gate. The Ordering Party Allows An Alternative Fence Made Of Coated Steel Mesh, E.G. 40X40 Mm, Consisting Of Max. 2 Connected Mesh Elements, E.G. 2.5X2.5 M. Cable Connector With Control Cabinet - 1 Set - External Lighting Installation, - 0.277 Km - Lighting Masts, - 6 Pcs. - Lighting Fixtures - 10 Pcs. 5) Hardening - Earthworks, - Concrete Edges On A Concrete Footing With Resistance, - 199 M - Substructure Made Of Mechanically Stabilized Crushed Aggregate 384 M2 - Surface Made Of Concrete Paving Stones, 6 Cm Thick - 384 M2 6) Lawn - Mechanical Profiling Of The Ground, - 200 M2 - Fertile Soil Layer, 10 Cm Thick - 200 M2 - Construction Of Grass Surface With Sowing (Grass Seeds) - Note: The Subject Of The Order Does Not Include The Construction Of The Designed External Lighting Installation On The Section From The Designed Zl Meter Connector. 1 To The Zk 1 Cable Connector At The Pitch And The Construction Of A Container Locker Room With Infrastructure, I.E. Water Supply Connection, Water Meter Well, Sanitary Sewer And Sewage Tank. The Zk1 Cabinet Should Be Located In Accordance With Pzt.3 The Detailed Scope Of Works Was Specified In The Following Documents: Construction Design, Technical Specification For The Execution And Acceptance Of Constru
|