1. The Subject Of The Order Is The Execution Of The Task Entitled: Reconstruction Of The Water Intake In The Town Of Pińczyce 2. The Subject Of The Order Includes, Among Others: Design And Implementation Of The Reconstruction Of The Water Intake In The Town Of Pińczyce. The Scope Of Work Includes, Among Others: Performance Of The Task Under The Design And Build Procedure Consisting In The Design, Reconstruction And Commissioning Of The Water Intake In The Town Of Pińczyce. A Detailed Description Of The Subject Of The Order Includes: Program Functional And Utility, Which Constitute An Annex To The Specification Of The Terms Of The Order. The Subject Of The Order Includes Comprehensive Performance Of: - Development Of Design Documentation, - Reporting Of Works Or Obtaining A Building Permit, - Obtaining The Arrangements Required By Law, - Preparation Of Technical Specifications For The Execution And Acceptance Of Works, - Construction And Installation Works Based On The Prepared Documentation, Including: - Demolition Works, - Dismantling Of Equipment At The Existing Station, - Construction Of A Second Set Of Horizontal Pumps, - Connection To The Existing Station. A Set Of Horizontal Pumps That Will Work As An Emergency Set, - Installation And Commissioning Of The Equipment Of The New Water Treatment Plant With Connection To The Network (Including Delivery, Installation Of Devices And Elements Included In The Facility And Their Commissioning), - Drying Of The Existing Building, - Electrical Works, Including: - Replacement Of The Electrical Installation With A Control Cabinet, - Installation Of New Lighting, - Installation Of 230V And 400V Electrical Sockets, - Installation Of Area Lighting - 4 Led Lanterns, - Construction Of A Concrete Slab For Tank With Capacity 300 M3, - Delivery And Installation Of A Tank With A Capacity Of 300 M3, - Laying A Floor With Ceramic Tiles, - Laying Ceramic Tiles On The Walls, - Painting The Walls In White, - Installing Door Joinery, - Building Ventilation, - Installing Exhaust Ventilation For The Ozonation And Chlorination Room, - Dismantling The Existing Fence, - Making A New Fence Of The Area From Prefabricated Panels With A Foundation, - Installing Gates, - Making Hardened Driveways And Paving Stone Sidewalks, - Replacement Of Pipelines On The Premises, - Well Casings - Stainless Steel Pipes, - Underground Pipelines - Installation Of A Sedimentation Tank For Rinsing Water Along With The Installation, - Planting Trees And Bushes Within The Plot, Installation Of Ozonation Blocks, - Contact Columns, - Second Stage Intermediate Pumps, - Second Stage Filters Dn2400, - Uv Lamps, - Flow Meters, - Compressed Air, - Oxygen Production, - Control. - Installation Of Measuring Devices Ozone In Water: At The Exit From Ozonation And At The Entrance To The Network, - Installation Of Ozone Sensors In The Air At The Station. - Installation And Connection Of A Device For Emergency Hypochlorite Dosing, - Launch Of The Suw, - Geodetic
|