Quotation are invited for AUXB 51 FDF2 Motor Base Plate Field Machining, K Station. AUXB 51 FDF#2 MOTOR BASE PLATE FIELD MACHININGTHE OBJECTIVE IS TO CORRECT COPLANAR VARIATION, BASE DISTORTION, ANDMOTOR BASEPLATE EL EVATION. ADJUSTMENTS SHALL BE BASED ON THE MOTOR TOFAN ALIGNMENT READINGS BEFORE STARTING MACHINING WORK, AS THE LATESTCHECK SHOWED THE MOTOR IS 0.7 MM HIGHER THAN THE FAN, TO ENSURE PROPERDYNAMIC ALIGNMENT AND MINIMIZE OPERATIONAL VIBRATION.SCOPE OF WORK· THE CO NTRACTOR SHALL PROVIDE ALL LABOR, PORTABLE MACHINING EQUIPMENT,CONSUMABLES, TECHNICAL SUPERVISION AND QUALITY ASSURANCE TO MACHINE,L EVEL AND FLATTEN THE MOTOR BASE PLATE.· PROVIDE PORTABLE MILLING MACHINERY, CUTTING TOOLS AND MEASURINGINSTRUMENTS· PERFORM MACHIN ING OPERATIONS AND FINAL MEASUREMENTS VALIDATION· MOTOR WILL BE REMOVED, SERVICED & REINSTALLED BY EMD (DEWA). VERIFY BASE STRUCT URAL INTEGRITY, FOUNDATION ANCHORS AND SURROUNDINGSCLEARANCES·PERFORM A PRELIMINARY SCAN / SURVEY OF THE EXISTING BASE PLATEFLATNE SS, COPLANARITY, AND ELEVATION VARIATION· REFERENCE EXISTING DATUM LINES (DRIVEN FAN SHAFT CENTERLINE ORELEVATION BENCHMARKS TO SET THE MACHINING PLANE· MACHINE THE MOTOR BASE PLATE TO ACHIEVE THE SPECIFIED FINISH ANDFLATNESS TOLERANCES ACROSS ALL PADS· ENSURE CLAMPING AND MILLING SETUPS DO NOT INTRODUCE MECHANICAL STRAINOR LOCALIZED HEAT DISTORTION TO THE BASE PLATE· COPLANARITY & FLATNES S OF THE BASE PLATE MUST BE FLAT AND COPLANARWITHIN 0.05 MM/M· PARALLELISM ALL PADS PARALLEL TO THE DRIVEN FAN#S SHAFT PLANE WITHIN 0.05 MM· PERFORM A POST-MILLING SURVEY TO VERIFY FLATNESS, COPLANARITY ANDELEVATION GOALS· REMOVE ALL SHARP EDGES,METAL SWARF, CH IPS AND DEBRIS FROM THE WORKAREA· APPLY A TEMPORARY RUST PREVENTATIVE TO ALL FRESHLY MACHINED BAREMETAL SURFACES IF REQUIRED· INST ALL FIXED METAL PLATES WITH JACK BOLTS TO REPOSITION THE MOTORDURING ALIGNMENT· PERFORM PRECISION MOTOR TO FAN SHAFT ALIGNMENT ACCO RDING TO THE OEMDRAWING· ALL BIDDERS MUST VISIT THE SITE TO CHECK PHYSICALLY, MEASUREMENTSCOLLECTION AND DISCUSS OUR REQUIREMENTS B EFORE SENDING THE QUOTATION.· THE SELECTED BIDDER MUST HAVE PROVEN EXPERIENCE WITH SIMILAR DEWAJOBS.· MAXIMUM DURATION FOR FAN OVE RHAULING INCLUDING MOTOR BASE PLATEMACHINING WORK(REQUIRED JOB)(FROM WORK START AT SITE TILL WORKCOMPLETION & COMMISSIONING) WILL BE 10 DAYS. Qty: 1 AUXB 51 FDF2 Motor Base Plate Field Machining, K Station Contact: mohamed.mahmoud@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332602398)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118600974
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.