|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing And Maintenance Of Damage Line/Pole Works Under Edd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 8.5 Mtrs. Long Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of 11 Mtrs. Long St Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Line Materials I.E. 11 Kv X-Arms, G.I Wire,Disc Insulators, Pin Insulators, Cl S And Other Required For Lt/11Kv Line, If Any Form Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Acsr Weasel Conductor From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Single Support By Pcc/St Pole Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Norms. The Support Shall Be Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 . It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Double Support By Pcc/St Pole Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Norms. The Support Shall Be Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 . It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Laying, Sagging, Stringing, Binding & Jumpering Of Acsr Weasel Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Stay Set Galvanised Including The Work Of Nozzling Etc. As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. , Guarding Of Ht/Lt 11 Kv Line With Gi Wire As Per Respo Norms. Including The Cost Of Arrangement Of Labour, T&P Etc Required For Proper Completion Of Work. , Re-Sagging, Stringing/Binding And Jumpering Of Old Line As Per Direction Of Executive Engineer. It Includes The Cost Of Labour, T&P Etc Required For Proper Completion Of Work. , Re-Nuzzling Of Old Stay Set By Opening Old Binding For Better Straightening Of Pole And Re-Sag The Existing Conductor Of H.T/L.T Line Properly As Per Direction Of Executive Engineer. , Straightening Of Pcc/St Pole Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour,T&P Charges Required For Proper Completion Of Work. , Chopping Of Tree Branches To Clear The Line Route To Give Horizontal And Vertical Clearance To The Line Including Cost Of Labour T&P Etc. , Replacement & Re-Installation & Fixing Of Following Damaged Accessories. Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Lt Shackle Insulator , Top Channel , 11 Kv Polymer Disc Insulator (T&C) 45 Kn , 11 Kv Pin Insulator With Pin , 11 Kv Steel Cross Arm V-Type , Lt Pin Cl For 8.5 Mtr Long Pcc Pole , 11 Kv F Cl For 8.5 Mtr Long Pcc Pole , 11 Kv Cross Arm Cl For 8.5 Mtr Long Pcc Pole , Disc Fitting (B&S) 70 Kn , 11 Kv Dp Cl , Received Back Of Old Scrap Pole/Material/Cable From Pit Site To Je Store/Store Center Etawah Including Loading & Unloading And Proper Stacking.
|