Tenders Are Invited For Modernization Of The Swimming Pool Hall In The Part Of The Recreational Pool And Con ... in Poland
Tender Notice
TenderID
118548767
Tender Brief
Tenders Are Invited For Modernization Of The Swimming Pool Hall In The Part Of The Recreational Pool And Construction Of A Paddling Pool With Water Attractions For Children
1. The Main Assumption Of The Planned Modernization Of The Swimming Pool Hall Is To Free And Transform Part Of The Recreational Pool Basin (Previously Serving As A Slide Dynamometer) For Recreation And Rehabilitation Purposes, Along With The Creation Of A New Water Attractions Zone For Children In The Form Of A Swimming Pool Paddling Pool.2.The Scope Of The Order Includes Flooring And Finishing Works (Including Laying The Pool Foil), As Well As Delivery, Assembly And Integration Of New Water Attractions For Children Into The Pool Technology.3.The Pool Paddling Pool Will Be Constructed By Building Two Walls, Insulating Them And Covering Them With Pool Ceramics. In One, On The Pool Side, A Linear Drain Made Of Stainless Steel Should Be Made. Then, Completing The Pool Stoneware Tiles, Leveling The Floor And Lining The Pool With A Thickness Of 1.5 Mm, Light Blue, Protected With Two Layers Of Acrylic Coating.4.After Completing All The Work, Assembly And Installation Of The Purchased Water Attractions For Children Should Be Carried Out. Installation In Accordance With The Manufacturers Recommendations, If There Are None, In Consultation With The Supervisory Inspector.5.Scope Of Construction Works: 1) In Order To Perform The Above Task, In Particular, It Is Necessary To Build Two Walls, 8 M Long And 30 Cm High, Limiting The Shower Tray Area - Location Indicated In The Attached Drawing - Annex No. 10 To Swz.6.Scope Of Hydraulic Works: 1) Hydraulic Works Will Consist In Connecting The Attraction To The Existing Swimming Pool Water Treatment Installation In The Sub-Basin Part. Installation Length Approximately 80M. Water Supply Via Glued Pipes, Adapted To The Existing System. Drain Using The Traditional Method, Drilling Holes Through The Reinforced Concrete Ceiling (Beach) And Selecting A New Pump As Needed. 2) The Given Installation Lengths Are Indicative And May Change Depending On The Actual Connection Transitions And Implementation Conditions. It Is Allowed To Shift The Location Of Individual Water Attractions By Up To 50 Cm In Relation To The Documentation, After Prior Consultation With The Ordering Party.7.Scope Of Assembly Works: 1) In Order To Perform The Above Task, In Particular: A) Construction Of A Swimming Pool Shower Tray: Construction Of Moisture-Proof Insulation Of The Brick Walls, Including Installation Of An Injection Hose And Its Filling, Waterproof Mortars (Cement Slurries), Ceramic Cladding Of The Brick Walls With Swimming Pool Tiles, Construction Of An Overflow Gutter On One Side With An Overflow Grate, Preparation Of The Substrate Under The Pool Foil, Lining The Paddling Pool With Pool Foil, Sealing The Toys, Installing A Stainless Steel Arch Balustrade On The Wall Of The Rushing River, B) Delivery, Installation And Launch Of Water Attractions For Children - 11 Pcs.8.The Subject Of The Order Was Described In Detail In Accordance With Art. 103 Section 1 Of The Public Procurement Law Using Design Documentation, Bill Of Quantities An
Contact Information
Address
Sports And Recreation Center Redzikowo Spółka Z Ograniczoną Odpowiedzialnością,Redzikowo,76-200,Pomorskie,Pl636 - Słupski
Contact No.
+48598412555
Email
prezes@osirredzikowo.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118548767
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.