|
The Subject Of The Order Includes The Performance Of Construction Works Related To The Implementation Of The Investment Titled: Construction Of An Educational Path In The Treetops As Part Of The Project New Horizons Of Education In The Roztocze National Park Based On The Attached Technical Documentation And On The Principles Specified In The Swz. 1. The Subject Of The Order Includes: 1) Separation And Fencing Of The Construction Site - Temporary Fencing Of The Construction Site, 2) Construction Of Temporary Access Roads - Securing Trees For The Duration Of The Works, 3) Surveying Services, Preparation Of A Work Organization Project, 4) Construction Of A Structure Made Of Prefabricated Colored Reinforced Concrete Elements, 5) Construction Of A Steel Structure, A Footbridge, Which Includes: A) Prefabricated Foundation Piles, B) Steel Structures S355j2 Bridge Balustrade In Accordance With The Pn-En 10025-2:2019-11 Standard Or Equivalent In The Scope Confirming The Quality, C) Metallization Anti-Corrosion Protection, D) Welded Tile Bridge Balustrade, E) Decks Made Of Composite Boards, F) Glass Platforms, G) Cladding S355w 3Mm Sheet Metal In Accordance With The Pn-En Standard 10025-2:2019-11 Or Equivalent To The Extent Confirming The Quality, H) Glass Bridge Balustrade, I) Securing The Tilting Of Trees Close To Objects In Order To Protect Them Against Mechanical Damage. 6) Construction Of Equipment And Devices (Seats, Boards Outside The Tunnel With Led Lighting, Boards In The Tunnel) 7) Carrying Out General Construction Works Of Individual Elements Of The Path, Including: A) Entrance Square Gravel Surface,B) Educational Gate,C) System Of Roofed Retaining Walls Tunnel,D) Recreational Linear Footbridge,E) Field Amphitheater,F) Meeting Square,G) Pedestrian Bridge - Pier With Swings,H) Field Stairs,I) Educational Boards,J) Educational Gazebo,K) Cascading Earth Terraces Platforms,L) Shelter - Pavilion Educational,M) Pedestrian Bridge,N) Earthen Terrace Turning Point Pedestrian - Recreational Elements - Observation Deck Air Roundabout F. Footbridge - Descent Stairsq) Exit Gate,R) Gravel Path.8) Execution Of Works In The Field Of Rainwater Drainage And Fire Protection Installations. Dry Riser,9) Execution Of Works In The Electrical And Automation Industry: A) High-Current Electrical Installations, B) Oem Building, C) Emergency Lighting Fixtures On The Footbridge, D) On Platform, E) Pz Points, F) Field Wiring.10) Execution Of Works In The Telecommunications Industry: A) Ticketing System, B) Video Surveillance System, C) Active Devices, D) Burglary And Alarm System Attack,E) Cable Ducting11) Educational Elements:A) Desktop And Vertical Educational Boards, Educational Boards,B) Educational Elements, Including: Pylons, A Model Of The Earth, Graphics On The Walls, An Openwork Viewing Rail, A Replica Of A Cross-Section Through A Trunk, A Model Of A Fragment Of A Tree Trunk With A Hole.2. Additionally, As Part Of The Subject Of The Order, The Contractor Is Obliged
|