|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - The Work Of Erection Of Line And Other Associate Work Under Full Deposit Scheme At Various Place Under Edd Sasni Hathras; Electrical System Or Installation; Na - Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc. Which Required For Proper Completion Of Work.(Distance 00-50 Kms.) , 8.5/9/11 Mtr. Long Pcc Poles. , 9/11/13 Mtr. S.T. Poles , Acsr Weasel Conductor/Dog Conductor , Earthing Complete , Stay Set Complete , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , 11 Kv X-Arm , Ab Cable , Metering Cubicle , Ct-Pt , 11 Kv Xlpe Cable , 11 Kv Fuse Set , 11 Kv Tpmo , Ms Angle Cross Bracing , 10/16/25/63/100 Kva T/F , Errection Of Following Poles Including Grouting, Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , 8.5/9/11 Mtr. Long Pcc Poles. , 9/11/13 Mtr. S.T. Poles , Errection And Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Safe Installation Of Following New/Repaired Cousted T/F On Newly Constructed Double Pole In Proper Alignment Direction & Making All Ht/Lt Connection. , 10/16/25/63/100 Kva T/F , Fixing/ Errection Of Following Item, Cost Of Labor, Material And T&P Which Required For Completion Of Work , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , 11 Kv X-Arm , Metering Cubicle , 11 Kv Fuse Set , 11 Kv Tpmo , Ms Angle Cross Bracing , Ct-Pt , Laying, Sagging And Stringing And Jumpering / Binding Etc. Of New & Old Acsr Weasal Conductor / Gi In 11 Kv / Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Weasel Conductor/Dog Conductor , Ab Cable , Xlpe Cable , Providing & Fixing Of Following , Different Types Of Cl , Nut,Bolt & Washer , Teeoff Channel , Suspension Cl , Dead End Cl , Single Phase Distribution Box With Cl , Pearcing Connector , Top Channel , Guarding Angle With Cl , G.I Wire 6/8/10 Swg , Dropper Channel , T/F Base Angle , G.I Pipe , Cable Jointing Kit , Cutting, Chopping, Triming Of Tree Branches To Clear The Line Route To Give 2 Mtr. Horizontal And Vertical Clearance To The Line Coming In The Route Of Different Feeders As Per Direction Of Supervising Engineer , Guarding/Reguarding Of 11 Kv Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. , Re- Sagging And Stringing Of Existing Following Conductor In Ht /Lt Line As Per Direction Of Supervising Engineer. , Acsr Weasel Conductor , Dismentlling And Removal Of Existing Line From The Various Area , Dismentlling Of Pole Stp/Pcc , Erection Of Existing Pole , Dismentlling Of 10/16/25/63/100 Kva T/F , Installation Of Existing 10/16/25/63/100 Kva T/F , Back Cartage , Acsr Weasel / Dog Conductor Scrap , Iron Scrap
|