1. The Order Covers The Material And Financial Scope Of Construction Works Under The Task Titled: Reconstruction Of The Catchment Point For Sewage Delivered At The Sewage Treatment Plant In Bartniki, Puszcza Mariańska Commune, Which Is Co-Financed By A Special-Purpose Subsidy From The Budget Of The Masovian Voivodeship Under The Instrument For Supporting Local Government Investments - Mazowsze Help.2.The Scope Of The Subject Matter Of The Order Includes, Among Others, The Execution Of The Following. Construction And Installation Works And Deliveries Of New Equipment And Materials: 1) Construction Of A Catchment Station - Purchase And Assembly Of A Prefabricated Technological Facility In The Form Of A Container Placed On A Concrete Slab, 2) Construction Of An Averaging Tank In The Form Of A Monolithic, Partially Buried In The Ground, Reinforced Concrete Tank Covered With A Ceiling Along With Equipment, Including: With Submersible Pumps, Aeration Mixer, Davits With Winches Made Of Acid-Resistant Steel, Ventilation Chimneys, Knife Gate Valves, 3) Delivery And Assembly Of A Complete Odor Neutralization System In The Form Of A Prefabricated Technological Facility In The Form Of A Container, Placed On The Ceiling Slab Of An Averaging Tank With A Capacity Of Min. 400 M3/H Including Installations,4) Construction Of An Unloading Tray In The Form Of A Flat Reinforced Concrete Structure,5) Construction Of A Gate Valve Chamber In The Form Of Wells Made Of Prefabricated Concrete Elements, Together With The Installation And Connection Of Technical And Technological Devices,6) Reconstruction And Construction Of New Water And Sewage Pipelines With Inspection Wells,7) Purchase And Installation Of Power Supply And Control Cabinets,8) Reconstruction And Construction Of New Power, Control And Signaling Cables, 9) Purchase Of A Pc Computer Whose Monitor Cannot Be Smaller Than 24” For The Purposes Of The Catchment Station Software, Expansion Of The Scada System, 10) Hardening Of The Surface Enabling Access To The Designed Facilities, 11) Drainage Works - In The Event Of Groundwater Occurrence, 12) Road Works Related To The Construction Of A Temporary Access To The Construction Site, 13) Disassembly Of The Existing Fence And Reassembly, In The Event Of Their Damage During Disassembly, Installation Of New Elements.14) The Contractor Is Obliged To Prepare The Plc Controller Of The Catchment Point For Integration With The Existing Scada System Of The Ordering Party. The Contractor Is Obliged To Issue A Complete, Described Map Of Communication Registers In The Modbus Protocol And Provide It To The Ordering Party. The Implementation Of New Graphics And Registration Of Signals In The Central Scada System Will Be Performed By The Contractor As Part Of Technical Assistance And Cooperation With The Creator Of The System, The Costs Of Which Must Be Borne By The Contractor. Included In The Price Of The Offer.15) Maintenance Of The Subject Of The Order (Staking Out And Post-Constr
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118438868
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.