1. The Subject Of The Order Is The Renovation Of The Sports Field At The School Complex No. 5 At Ul. Szczawnicka 1 In Warsaw. 2. List Of Areas: Area Of A Football Pitch Made Of Synthetic Grass - 1,070 M2.3. The Scope Of Works Constituting The Subject Of The Order, In Particular, Includes: Basic Order (Guaranteed): 1) Preparatory Works, Including Securing The Construction Site, Preparation Of Facilities, Geodetic Marking, Preparation Of A Bioz Plan. 2) Demolition Works, Including Removal, Disposal Or Transfer For Recycling Materials From Demolition.3) Renovation Of The Football Pitch Surface: A) Preparatory Works B) Demolition Works Of The Existing Concrete Surface Along With The Edges And Accompanying Infrastructure Such As: Lighting, Linear Drainage, Rainwater Wells. C) Construction Of The Pitch Substructure. D) Construction Of A New Synthetic Grass Surface Dedicated To The Pitches. E) Delivery And Installation Of Ball Catch Poles With Nets And Goals For The Pitch. Football Field With Nets.F) Construction Of Linear Drainage With A Sedimentation Tank With A Settling Basket.G) Construction Of Conduits For Lighting And Monitoring.H) Construction Of Foundations For The Lighting Poles Of The Pitch. Optional Order - Option Right: 1) Laying Of Electric Cables For The Lighting Of The Football Pitch.2) Delivery And Installation Of Lighting Poles With Led Lighting Fixtures For The Football Pitch.3) Construction Of Expansion Of The Electrical Switchboard With Making Lighting Switches With A Programmable Timer.4) Delivery And Installation Of Boxes For Cctv And Wifi Installations.5) Taking Measurements.4.The Detailed Scope Of The Subject Of The Order Is Specified In The Design Documentation, I.E. Description Of The Subject Of The Order - Annex 11 To The Swz, Executive Design Titled Development Of Technical Documentation For The Renovation And Development Of The Sports Area In The School Complex No. 5 At Ul. Szczawnicka 1 In Warsaw - Demolition Works, Site Preparation, Construction Of Sports Fields, Sidewalks And Green Areas, Prepared By Studio Budowlane Unity S.C. Of July 20, 2026, - Annex 12 To The Swz, Bill Of Quantities - Annex 13 To The Swz, Technical Specification For The Execution And Acceptance Of Construction Works - Annex 14 To The Swz.5.The Scope Of Work To Be Performed Includes All Work That Must Be Performed For The Completed Elements To Fulfill The Intended Function And Those That Result From The Technology Of The Work, Construction Practice, And Construction Law Provisions, Even If They Were Not Separately Described In The Technical Specification For The Execution And Acceptance Of The Works, Along With The Removal Of All Defects And Faults Related To The Execution Of The Works.6.Additional Obligations Of The Contractor Resulting From The Social Clause Pursuant To Art. 95 Section 1 Of The Public Procurement Act, The Ordering Party Requires That The Contractor Or Subcontractor Employs On The Basis Of An Employment Relationship Within The Meaning
Contact Information
Address
City Hall Warsaws Praga-Południe District,Warszawa,03-841,Mazowieckie,Pl911 - Miasto Warszawa
Email
pragapoludnie.wzp@um.warszawa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118438842
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.