1. The Subject Of The Order Is: Reactive Power Compensation Service In Military Complexes Located In: Lublin, Włodawa, Dęblin (Airport), Nowa Dęba. 2. Cpv Codes: 71500000-3 - Construction Related Services3. Location: The Subject Of The Agreement Will Be Performed In Military Complexes: – Lublin, Ul. Droga Męczenników Majdaneka 70 – Lublin, Ul. Nowy Świat 40 – Włodawa, Ul. Sztabowa - Dęblin, St-Port Station, Primary Power Supply - Dęblin, Ul. Saperów 5, St-60 Station - Dęblin, St-39 Station - Dęblin, St-68 Station, Section I - Dęblin, St-44 Station, Primary Power Supply - Nowa Dęba, St-21 Station Constituting A Closed Area Listed In Decision No. 91/Mon Of The Minister Of National Defense Of July 26, 2024 On The Determination Of Closed Areas In The Ministry Of National Defense. A) The Areas Of The Complexes Are Covered With Buildings, Have Internal Roads, Squares, Sidewalks And Green Areas. B) Deliveries And The Entry Of Persons Not Registered To Perform The Service Must Be Agreed Each Time With A Representative Of The Military Unit Before They Begin. 4. Description Of The Subject Of The Order: The Subject Of The Order Includes: A) Performing Measurements With A Class A Network Analyzer In Order To Confirm The Effectiveness Of The Compensation And Filtration Process, Which Are To Be Implemented By Active Filters. Measurements Should Be Carried Out During A Representative Load Period. For Each Ppe Covered By The Proceedings, A Report Should Be Prepared Containing Charts Of: - Active And Reactive Power (1-Phase Values And 3-Phase Sum) - Phase Currents - Phase Voltages - Frequencies - Distortion Coefficients Of Current And Voltage Waveforms (Thdi And Thdu) - Fft Spectra Of Higher Harmonics In Current And Voltage Waveforms Up To The 50Th Harmonic; B) Conclusions Containing An Assessment Of The Effectiveness Of The Selected Active Filter; C) Each Report Should Be Accompanied By A Current Calibration Certificate Of The Class A Analyzer Used To Perform The Measurements And A Copy Of The Qualifications Of The Person Who Performed Them; Preparation Of Design Documentation Along With The Required Arrangements: Installation Of An Active Filter With A Power Of 50 Kvar/75A, In An Ip20 Housing, Adapted For Installation Inside A Transfer Station/Building, In An Ip54 Housing, Adapted For Outdoor Installation In A Dedicated Housing; E) Construction Of A Cable Route To Power The Active Filter; F) Construction Of A Field Feeding The Active Filter; G) Implementation Of A Current Measurement System In Each Of The Power Supply Phases Using Current Transformers Selected To The Station Load; H) Construction Of A Cable Route To Power The Active Filter; I) Laying The Power Cable Between The Fuse Switch And The Active Filter - Cable Line 5X35 Mm2, Requires The Use Of A 0.6/1Kv Power Cable; J) Laying The Signal Cable From Current Transformers - It Is Required To Use A Control Cable With A Cross-Section Of 6X2.5 0.6/1Kv; K) Setting The Active Filter At Real Load; L) Configur
Contact Information
Address
District Infrastructure Authority In Lublin,Lublin,20-020,Lubelskie,Pl814 - Lubelski
Email
rzilublin.zampub@ron.mil.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118438748
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.