- Environmental Supervision - Cutting Down Bushes, Managing The Material On Your Own - Cutting Down Trees, Shredding The Material And Managing It Yourself - Transport Of The Harvested Wood To The Storage Yard - Cleaning The Area After Clearing Of Small Branches And Bark With Transport - Reprofiling Of Slopes And The Bottom Of The Watercourse - Spreading The Soil Extracted From The Excavations - Making A Lining Of Thick Forest Fascine. 20 Cm Layer - Making A Faced Stone Rip-Rap With Boulders Of Min. Size 80 Cm, Mechanically Wedged Rip-Rap - Filling Of Holes On The Slope - Making A Facing Stone Rip-Rap In The Bottom With Boulders Of Min. Size 50 Cm, Mechanically Wedged Riprap - Making Double Bands From The Halves Of Poles, 15 Cm Wide - Making A Stone Riprap Above The Band Made Of Boulders, Min. 25-20 Cm, Mechanically Wedged Riprap - Repair Of Mesh-Stone Structures, 20% Recycled Stone, New Baskets - Construction Of A Palisade With Pegs 10-12 Cm L = 1.5 M Deep. Driving 1.2 M - Manual Planting Of The Native Soil Surface - Sowing Of Slopes
Contact Information
Address
State Water Holding Polish Waters,Warszawa,00-613,Mazowieckie,Pl911 - Miasto Warszawa
Email
zamowienia.gliwice@wody.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118438613
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.