Mechanical Locking 16 Residential Properties Are Subject To Serialization. The Mechanical Locking Of The Objects Is Renewed With The Abloy Easy System. The Cylinders Will Be Renewed, The Old Lock Frames And Hems Will Be Kept. The Contractor Is Obliged To Familiarize Himself With The Sites Before Submitting The Offer And To Ensure That The Locking Diagrams Are Up-To-Date. Garbage Canopies, Yard Buildings, Mailboxes, Etc., Are Locked In Areas Where These Are Already Locked. The Contract Also Includes Greasing The Bars Of The Locks And Key Sockets (Operating Locks, Safety Locks, Long Latches) And Tightening The Screws. Other Necessary Repairs Are Made As Additional Work If Necessary. The Contract Includes All Work And Supplies To Achieve The Finished Result, As Well As A New Locking Diagram. In Addition To The New Locking Scheme, Updated Layout Floor Plans Of The Common Spaces Will Be Prepared For The Customer. Locking Diagrams And New Keys Are Delivered To Key Management Points (Maintenance Company/Lock Shop). The Scope Of The Locks Is In Accordance With The Old Lock With The Following Notes: - 3 Keys / Key Types Apartment, Magazine Dispenser, Route, Club Room, Etc. - 7 Service Keys, Of Which 1 Is Delivered To The Ktl1e System Key Storage - 7 Universal Keys - All Keys Are Stamped (Personalized Identification) - The Locks Available Reserve Must Be As Large As Possible Keys Are Delivered To The Key Management Point At The Latest 14 Days (2 Weeks) Before The Start Of The Agreed Installation Period. Serialization Of Telecommunications Ktl1e In Addition, The Common Telecommunication Rooms Of All Properties Are Serialized To The Ktl1e System, And The Ktl1e System Key Nest Is Installed On The Outer Wall Of The Buildings (If There Are No Empty Spaces, Drilling The Key Storage Tube Into The Wall Is Also Included In The Contract). Shared Telecommunication Spaces Include House Distribution Boards, Sub-Distributors, Floor Distribution Boards And Other Door-Mounted Enclosures And Boxes Containing Switching Points Or Telecommunication Equipment Installed In Common Premises. The Ktl1e Key Storage Tube Is Supplied With 1 Item Of Service Keys. Two Access Keys For The Key Container Are Delivered To The Key Management Point Together With The Other Keys. The Subscriber Is Responsible For The Connection Fees For The Ktl1e System. Notification Notifications About The Start Of Work (On A Site-Specific Basis) Are Made In Cooperation With The Subscriber No Later Than 3 Weeks Before The Start Of The Installation Work. Residents Must Have At Least 14 Days After Receiving The Notice To Pick Up The Keys From The Key Management Point Before Starting The Work. The Subscriber Is Responsible For Distributing The Newsletters. Contract Time The Contract Period Is Agreed Separately, However, So That All Installations Are Ready By The End Of March 2027.
Contact Information
Contact Person
Jyväskylän Vuokra-Asunnot Oy
Address
Pl 1010
Contact No.
+358503119979
Email
sini.keronen@jva.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118432368
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.