Office Block Construction Work – Bmukn - Hollow And Raised Floor Din 18340 - Award 2017/2026. An Extension Of The Bmukn Is Being Built On The Stresemannstrasse / Erna-Berger-Strasse Property In Berlin-Mitte. The Building Is Divided Into Two 7-Story Components A And B, Which Are Connected To Each Other Via A Multi-Story Bridge. 1. Type And Scope Of Service Hollow Floor Approx. 250 M² Hollow Floor Made Of Fiber-Reinforced Calcium Sulfate Panels, Substructure As A Control Room Construction Made Of Galvanized Steel Frame And Height-Adjustable Galvanized Steel Supports; Approx. 90 M² Hollow Floor As Fiber-Reinforced Calcium Sulfate Panels, Substructure Made Of Height-Adjustable Galvanized Steel Supports; Including Underground Cleaning; Including Wall Connection Tape; Approx. 151 M Of Groove Milling For Underfloor Heating Including Filling With Filling Compound; 4 Pcs. Inspection Openings In The Hollow Floor Raised Floor Approx. 1,150 M² Raised Floor Made Of Fiber-Reinforced Calcium Sulfate Panels With Linoleum Covering, Substructure As A Control Room Construction Made Of Galvanized Steel Frame And Height-Adjustable Galvanized Steel Supports; Approx. 1,100 M² Hollow Floor Made Of Fiber-Reinforced Calcium Sulfate Panels With Linoleum Covering, Substructure Made Of Height-Adjustable Galvanized Steel Supports; Approx. 280 M² Raised Floor Made Of Fiber-Reinforced Calcium Sulfate Panels With Rubber Covering, Substructure As A Control Room Construction Made Of Galvanized Steel Frame And Height-Adjustable Galvanized Steel Supports; Including Fitting Plates, Recesses, Bores And Bridging Beams To Bridge Missing Supports; Including Underground Cleaning; Including Wall Connection Tape; Approx. 20 M² Raised Floor Made Of Steel Ventilation Panels With Infinitely Variable Ventilation Volume Regulation Using Throttle Plates, Substructure As A Control Room Construction Made Of Galvanized Steel Frame And Height-Adjustable Galvanized Steel Supports; Approx. 285 M Cabinet Installation Frame For The Control Room Floor Made Of C-Profiles Made Of Galvanized Steel Protective Measures Approx. 1,250 M² Of Temporary Cover For The Raised Floor Made Of Chipboard; Approx. 3,000 M² Protective Cover Of The Hollow/Raised Floor With Beverage Raton 2. Execution Deadlines Start Of Execution: No Later Than 12 Working Days After Receipt Of The Order Letter Start On The Construction Site: February 15Th, 2027 Completion: February 9Th, 2029 3. Note - Bnb Certification A Bnb Certification In Gold And A Bnb Certification In Silver For The Outdoor Facilities Desired. The Contractor Must Contribute To The Successful Certification. The Contractor Must Comply With The Relevant Requirements Regarding Low Waste, Low Noise, Low Dust Levels And The Requirements Of The Federal Soil Protection And Contaminated Site Ordinance During Construction. Furthermore, The Requirements Listed In Appendix 01 “Material Requirements” Apply At Quality Level 5. The Contractor Must Declare All Materials, Products, By-Products And Auxiliary Products As Well As Components Intended For Use With Regard To Their Ingredients And Properties. For This Purpose, Appendix 02 “Declaration Tables” Is Available In Digital Form (Exce
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118302441
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.