|
The Scope Of The Investment Includes Hardening The Street Surface With Yomb Boards. Smażyńska In Łebno On A Section With A Total Length Of Approximately 680.00 M And A Width Of 4.5 M - 5.0 M + Roadsides 2 X 0.5 M. The Investment Includes Hardening Two Sections Of The Road, Respectively, 180 M Long And 500 M Long. Scope Of Work: • Total Surface Area Of Slabs: 3,444.12 M² (Section 180 M - 886.2 M², Section 500 M - 2557.92 M²)• Total Number Of Boards: 4,593 Pcs. (Section 180 M - 1,182 Pcs. Section 500 M - 3,411 Pcs), Of Which: - 1,387 Pcs. Of Boards Are Provided By The Ordering Party, And - 3,206 Pcs. Of Boards Are Provided By The Contractor. • Length: 680 M, Width: 4.5-5 M + Roadsides 2 X 0.5 M • Carrying Out Geodetic Measurements - Reconstructing The Route And Height Points, • Cleaning Roadsides And Restoring Roadside Ditches, • Carrying Out Earthworks, In Particular Trenching Along With Profiling And Compacting The Subsoil, • Foundations And Surface Works - Gravel And Sand Base • Yomb Slab Surface Partially Delivered By The Ordering Party (1,387 Pcs. Of Slabs And The Contractor (3,206 Pcs. Of Slabs, Slab Dimensions: 75X100x12.5 Cm), • Development Of Roadsides, • Removal Of Any Bushes And Stumps Located In The Road, • Development Of A Temporary Traffic Organization Project, • Preparation Of An As-Built Inventory Of The Rebuilt Road Section. 3. The Contractor Is Obliged To Perform As-Built Geodetic Measurement Tasks; Documentation Stamped With Appropriate Stamps Confirming Positive Control By The District Office Should Be Submitted In Writing - 3 Copies And Electronically In (Pdf Or Jpg And A File Opened By The Cartographic Program Mmp Or Dxf). 4. In All Provisions Of The Swz And Its Annexes In Which The Ordering Party, Due To The Inability To Describe The Subject Of The Contract In A Sufficiently Precise And Understandable Way, Refers To Standards, Technical Assessments, Technical Specifications Or Systems. Technical References, Or Trademarks, Patents, Sources Of Origin Or Specific Processes That Characterize The Products Or Services Provided By A Specific Contractor Are Indicated, In Accordance With Article 99(5) Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described. That The Contractor Is Obliged To Deliver The Mentioned Products. This Information Is Included Only To Present The Assumptions And Expectations Of The Ordering Party. These References Are Intended To Indicate The Technical Level Or Functional Point Of Reference For Specific Manufactured Products To Maintain The Expected Level Of The Product Standard, E.G. Those Selected For Installation. These Products Are Not Obligatory For Use, And The Selected Contractor Has The Right To Propose Equivalent Solutions Provided That The Parameters Specified In The Order Documents Are Met The Solution Specified By The Ordering Party Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches A List Of Equivalent Solutions T
|