Construction Work – K 3335 Level Crossing Removal Goldshöfe - Wagenrain: Bridge Over The Railway Bw 7126 745. Remove And Cover Approx. 1,600 M3 Of Topsoil And Loosen Approx. 9,000 M3 Of Soil. Install And Improve Approximately 15,000 M3 Of Soil And Create A Frost Protection Layer Of Approximately 4,000 M3. Create Approx. 1,500 M3 Of Gravel Base Layer. Create Approx. 7,500 M2 Of Asphalt Base Layer. Create Approx. 2,700 M2 Of Asphalt Binder Course. Produce Approx. 8,000 M2 Of Asphalt Surface Layer. Produce Approx. 1000 M Of In-Situ Concrete Piles With A Diameter Of 62.5 Cm. Produce Approx. 850 M Of In-Situ Concrete Piles With A Diameter Of 120 Cm. Produce Approx. 300 M2 Of Steel Sheet Piling Approx. Install Reinforcing Steel Approx. 30 Tons. Install Prestressing Steel
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118253270
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.